1) tube element prefabrication
管节预制
1.
The technical development in tube element prefabrication,tube element waterproofing,docks and foundation treatment are discussed in this paper.
沉管隧道工法为水下隧道建设的主要工法之一,其关键工序包括管节预制、浮运、沉放对接和基础处理等。
2) segment precasting
节段预制
1.
In this paper,the principal construction techniques for the main arch of the bridge are briefly described,in which the segment precasting,cable crane installation and construction monitoring are included.
简要介绍主拱的主要施工技术,包括节段预制、缆索吊机安装以及施工监测等。
2.
The construction of a reinforced concrete deck box arch bridge was carried out by segment precasting,cable crane installation and cantilever erection by the aid of stayed cables with the cables fixed by the anchors embedded in rocks.
上承式钢筋混凝土箱形拱桥,采用节段预制,缆索吊机安装,扣锚索悬臂架设。
3) precast segment
预制节段
1.
The main parts of the approach bridges of Sutong Bridge are of twin prestressed concrete continuous girder bridges with spans each 75 m of constant cross sections and six lanes on the carriageways,and the superstructures of the parts of the bridges were erected by precast segmental assembling construction method.
苏通大桥主引桥为双幅6车道75 m跨等截面PC连续梁桥,其上部结构采用预制节段拼装架设的施工方法。
2.
The precast segmental construction technique is widely used in the viaduct structures for both vehicular and light rail systems.
预制节段拼装连续梁桥可广泛应用于高架桥和轻轨等建设项目。
4) prefabricated segment
预制节段
1.
Based on the practice and summary of Hu-Min Viaduct (II) construction in Shanghai by erecting prefabricated segments span by span, des-cription is made of the mechanism and way of computer-aided control (CAC) over the load transformation, a key step of workmanship.
通过对上海市沪闵路高架道路二期工程中预制节段逐跨拼装施工的实践和总结,在介绍预制节段逐跨拼装施工的基础上,叙述了运用荷载转换这一关键工艺进行计算机辅助控制的原理与方法。
2.
Described hereby are the initial study and summary of the key measures and precautions taken during the construction of prefabricated segment span-by-span installation of Hu-Min Rd Viaduct (II), and Jungong Rd Viaduct (Contract A1.
1标军工路高架预制节段逐跨拼装施工的实践为基础,初步探讨、总结了该类施工方法在技术管理上前期预备阶段、实施准备阶段、实施阶段的主要方法和注意点。
3.
The elevated bridge in the partial main line of Shanghai Humin Elevated Road Phase II Project used the prefabricated segmental erection construction technique by spans.
上海市沪闵高架二期工程部分主线高架桥采用了预制节段逐跨拼装的施工技术,主线桥宽达25m,底面为弧形。
5) recasting pile unitin jecting
预制桩节
6) precast nodular pile
预制节桩
1.
This paper introduces the basic shapes of the nodular pile,summarizes two cast-in-site tests which have been done in Tianjin soft clay and one model test for precast nodular pile in sand soil,and analyzes some test curves,and sums up the researches on the bearing mechanisms of nodular pile made in the three tests.
给出了节桩的基本形状,简要概括了有关预制节桩在天津软黏土中进行的两个现场试验和一个砂土中的模型试验研究,并且分析了一些试验曲线,总结了这3个试验对节桩承载机理的研究。
补充资料:管节
1.古代使者所持的一种符节﹐用竹制成。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条