说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 设计-施工模式
1)  design-build method
设计-施工模式
2)  Design and Construction Contract Mode
设计施工总承包模式
3)  construction design
施工设计
1.
Crack control and construction design of mass concrete;
大体积混凝土裂缝控制和施工设计
2.
Modest proposal on construction design of Railway Management Information System;
铁路信息系统工程施工设计之刍议
3.
This paper introduces the construction design of a fine tissue project with the annual capacity of 30000 tons, and briefly introduces the structure features of Metso DCT 100 Periformer Crescent PM with the hope of being helpful to the construction and design of similar projects.
从工艺流程、设备选型、参数确定、系统特点,厂房与设备布置等方面介绍了年产3万吨高档生活用纸的施工设计,并简要介绍了METSO公司的DCT100型新月型纸机的结构特点。
4)  design and construction
设计施工
1.
Experience and skill for artificial sill pillar design and construction in medium-thick orebody
中厚矿体人工底柱设计施工经验及技巧
2.
The key technologies in the design and construction and the application prospects for the combined bridge structure in our country
组合结构桥梁设计施工关键技术及在我国工程应用前景
3.
Through the sprinkler system's design and construction,the author finds some defferences between FM and domestic design norm,which should be paid much attention by professionals from the same occupation.
通过工程设计、施工,发现FM与国内设计施工规范在喷淋系统中存在着一些差异,以引起同行的注意。
5)  working design
施工设计
6)  design-build
设计-施工
补充资料:承包人要求发包人作好施工前的准备工作的权利
承包人要求发包人作好施工前的准备工作的权利:施工前的准备工作是整个工程建设过程的重要组成部分,是保证工程建设按期开工和保证工程质量的一个重要环节。发包人应当按照合同的约定作好施工前的准备工作,包括:于施工前办妥正式工程和临时设施范围内的土地租用、征用申请施工许可证,爆破及临时铁道专用线接岔许可证;确定建筑物(或构筑物)、道路、线路、上下水道的定位标桩、水准点和坐标控制点;开工前,接通施工现场水源,电源和运输道路,并按约定清除施工现场的障碍物;组织有关单位对施工图等技术资料进行审定,并按约定的时间和份数提供给承包人。合同中约定由发包人提供材料和设备的,发包人应按照约定的范围和时间向承包人提供材料和设备。根据《合同法》第283条规定,发包人未按照约定时间和要求提供原材料、设备、场地、资金、技术资料的,承包人可以顺延工程日期。并有权要求赔偿停工、窝工等损失。----------出自《合同法》第283条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条