说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 后锚固施工
1)  post-anchoring construction
后锚固施工
2)  anchorage construction
锚固施工
3)  Anchoring construction
锚固法施工
4)  anchoring construction technology
锚固施工技术
5)  anchoring method
锚固措施
1.
By adopting a new anchoring method, interfacial failure happened between CFRP sheets and concrete, the effective jointing length between Sika~ CarboDur~ CFRP sheets and concrete is about 200 mm, and the interfacial bonding shear strength reached 20~30 MPa.
经过试验研究,测定了复合材料碳纤维板与混凝土的有效粘接长度,并采用简单适用的粘接锚固措施,获得了碳纤维板与混凝土的界面破坏形式。
6)  anchored installations
锚固设施
1.
On the basis of field tests in the Yellow River Lijiaxia project, the influence of dynanic explosive load on the reinforced anchored installations such as anchor piles and anchorage cables is investigated.
本文根据在黄河李家峡工程施工中开展的现场试验 ,就岩石高边坡开挖时 ,爆破动荷载对已设置的边坡预应力锚杆锚索 (及锚筋桩 )等锚固设施的影响进行了研究。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条