说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 复合衬砌结构
1)  complex lining structure
复合衬砌结构
1.
By Using the complex lining structure composed of grid-shotcrete and concrete and taking effective measures of settlement control, it was succeed to ensure the construction safety and engineering quality.
通过采用格栅喷射混凝土和250mm厚混凝土的复合衬砌结构,并采取相应的沉降控制措施,确保了施工安全和工程质量。
2)  composite lining structure
复合式衬砌结构
1.
According to the access construction monitoring practice of step excavation method in Lianhua Tunnel with small spacing,the characters of surrounding rock deformation and composite lining structure load are studied.
结合莲花隧道进口小净距段的台阶法施工实践,介绍了地表下沉、洞周水平收敛、拱顶下沉、锚杆轴力、围岩压力、二次衬砌混凝土应力等项目的跟踪监测工作,分析和总结了围岩变形特征及其复合式衬砌结构的受力特点,所得结果为复杂工况下小净距隧道支护结构的新奥法施筑与优化提供了科学依据,也为类似隧道工程的施工提供了经验。
3)  lining [英]['laɪnɪŋ]  [美]['laɪnɪŋ]
衬砌结构
1.
The Mechanical Model of Shield Tunnel Lining;
盾构隧道衬砌结构的力学模型
2.
On the basis of seepage analysis, some problems on external water pressure on lining of tunnels are discussed in this paper.
三是对于高水头的深埋隧道,为避免量值较大的水压力,应设置排导系统,不宜采用全封堵衬砌结构。
3.
How much of hydraulic pressure value upon lining may be intituled high hydraulic pressure? Now, there isn’t clear boundary value in the field of tunnel engineering.
水压力较大时,水压力成为衬砌结构上的主要荷载,高水压力分界值与围岩级别的关系不大,而与衬砌断面形状关系密切,曲墙式衬砌承受水压力的能力远远超过直墙式衬砌。
4)  lining structure
衬砌结构
1.
Plane numerical analysis of mechanical behaviors of lining structure under high hydraulic pressure in mountain tunnel;
山岭隧道高水压下衬砌结构平面数值分析
2.
On the Scattering of SH-Wave by Semi-Cylindrical Hill with Lining Structure;
含圆形衬砌结构的半圆形凸起对SH波的散射
3.
Study of cold damages on lining structure and prevention measurement in cold regional tunnels
寒区隧道衬砌结构冻胀破坏分析及防治措施
5)  Structural Lining
结构衬砌
6)  composite lining
复合衬砌
1.
In this paper,a method is presented to assess the reliability of composite linings during the service life of tunnels.
提出了复合衬砌运营期可靠性评价方法,采用不等宽的脉冲随机过程描述钢筋混凝土衬砌的劣化,用施工资料和监测数据+基于连续介质模型的有限元计算+响应面法获得荷载效应的显式,给出了严格意义的可靠性计算公式,并给出算例。
2.
Mechanical effects of surrounding rock and composite lining are studied after small-distance tunnels located in soft strata achieves stability under different excavation manners with 3D fast finite difference software;and analysis is focused on the mechanical characteristics of bolt,shotcrete,the deformation and stress of surrounding rock characteristic points nearby the tunnel.
采用三维快速有限差分软件,以软岩小净距隧道在不同施工方式下达到稳定后围岩和复合衬砌的力学效应为对象,重点分析不同施工方式下锚杆、喷射混凝土层的受力特点,以及洞周围岩特征点的变形和应力。
3.
Mechanical effect of ground and composite lining is taken as study object after the small-distance tunnels located at soft ground achieves stability by different excavation methods,and the analysis is focused on mechanical characteristics of bolt,shotcrete,secondary lining,also the influence of middle rock wall different interval on the plastic zone of middle rock wall.
以软岩小净距隧道在不同开挖方式下达到稳定后围岩和复合衬砌的力学效应为对象,重点分析不同开挖方式下锚杆、喷射混凝土层和二次衬砌的受力特点,考察不同净距对中夹岩柱塑性区的影响。
补充资料:复合式衬砌
      分内外两层先后施作的隧道衬砌。在坑道开挖后,先及时施作与围岩密贴的外层柔性支护(一般为喷锚支护),也称初期支护,容许围岩产生一定的变形,而又不致于造成松动压力的过度变形。待围岩变形基本稳定以后再施作内层衬砌(一般是模筑的),也称二次支护。两层衬砌之间,根据需要设置防水层,也可灌筑防水混凝土内层衬砌而不做防水层。
  
  复合方式  复合式衬砌的外、内层复合方式有以下几种:喷锚支护和混凝土衬砌;喷锚支护和喷射混凝土衬砌;可缩式钢拱喷射混凝土支护和模筑或喷射混凝土衬砌,以及装配式衬砌(管片)和模筑混凝土衬砌等。最通用的是外层采用喷锚支护或轻型管片,内层采用整体式模筑混凝土衬砌(见图)。
  
  
  防水层  两层衬砌间的防水层,可采用喷涂乳化沥青等防水胶剂,或采用厚度不等的软聚氯乙烯薄膜、聚异丁烯片、聚乙烯片等防水卷材,并固定在支护上。为保证防水卷材施工接缝的质量,一般需要用热气焊接或电阻焊接,亦可用适当溶剂作溶解拼接。
  
  施工  复合式衬砌施工中的一个重要环节是喷涂或粘贴防水层,要求做到与初期支护相密贴,故在防水层施工前需要对初期支护的表面进行适当处理,使其平整圆顺,无较大渗水。初次支护的施工方法和要求,与一般喷锚支护或装配式衬砌的相同。内层模筑衬砌多采用模板台车和混凝土泵进行连续灌筑。
  
  设计  复合式衬砌中,外层支护与围岩形成统一的受力整体,共同承担因开挖坑道所产生的围岩释放应力。由于影响共同作用的因素很多,如围岩状态、支护施作时间、衬砌刚度和施工方法等,有些因素事先又无法预测,故分析计算只能作为设计时参考,必须根据施工过程的量测结果予以修正。内层衬砌主要为了防水、防风化、内部装饰和增加安全度,其厚度按施工要求而定,一般不超过40厘米。有时不易做到待初期支护变形完全稳定后再施作内层衬砌。例如当松软围岩流变引起的延滞变形历时很长时,这时内层衬砌所承受的荷载主要是由于围岩延滞变形产生的形变压力;以及因部分锚杆腐蚀失效,或涌水降低了围岩物理力学参数所引起的附加岩土压力。
  
  复合式衬砌的优缺点  采用先后两次支护,对衬砌受力非常有利。围岩在柔度较大的外层支护条件下,可产生较大的形变,释放了大部分的变形能;因而能使后设的内层衬砌减小受力。内层衬砌施作以后,又会对原先处于二维受力状态的外层支护产生径向抗力,从而改善外层支护的受力条件。而且表面光洁平整,有利于隧道通风和防水,并保护外层支护,使喷层内钢筋网和锚杆端部免于锈蚀。但是,这种衬砌的缺点是造价较高,施工也比较复杂。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条