1) operational risk
运行风险
1.
Research of peak-valley time-of-use price based on power system operational risk
考虑电力系统运行风险的峰谷分时电价研究
2) Run-Time Risk
运行态风险
3) operation risk assessment
运行风险评估
1.
Power system operation risk assessment can evaluate the likelihood and severity of contingencies, but it is time-consunming to analyze all possible contingencies in real-time environment.
电网运行风险评估可以综合考虑扰动事件发生的可能性和严重性,其模型复杂、计算量大。
2.
Absence of statistical components\' failure data is a great challenge for power system operation risk assessment.
缺乏历史故障统计数据是电力系统运行风险评估中的突出难题。
3.
A time-varying and condition-based component outage model is needed for operation risk assessment,which should consider the change of weather,aging degree and other operation conditions.
电力系统设备发生故障的可能性是随外部天气条件、老化程度等运行工况变化而变的,因此在运行风险评估中需要采用时变的设备停运模型。
4) Operation risk management (ORM)
运行风险管理
5) Operation-risk-cost
运行风险成本
补充资料:运行
1.周而复始地运转。 2.犹活动。 3.世运;命运。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条