2) price floor of mining right transferring
交易标底
3) crosslinking at well bottom
井底交联
4) management confiding
管理交底
1.
Thereafter the cause of formation, performance and precautions in management confiding are presented.
为项目尽早进入规范化管理,提高经济效益,提出了对新开项目进行管理交底的对策;并就管理交底的成因、作用和注意事项进行了阐述。
5) confiding technical intentions
技术交底
1.
Analysis on confiding technical intentions in building engineering construction;
浅析建筑工程施工的技术交底
2.
Discussion on the construction organization design,construction scheme and confiding technical intentions;
浅析施工组织设计和施工方案及技术交底
6) contract explanation
合同交底
1.
The contract explanation during the implementation of construction project;
关于在工程项目施工中进行合同交底
2.
The following paper illustrates the way to achieve the scientificity of project bidding supervision from scientific analysis of bidding documents supervision,price offer and contract explanation,and introduces the process of project management,in order to promote healthy and steady development of enterprise.
从对监理招标文件的科学分析、报价、合同交底等方面对如何实现监理项目投标的科学性进行了阐述,并对项目管理的过程进行了介绍,从而促使企业健康稳步地发展。
补充资料:标底
标底
bid
b 100d{标底(b id)工程“标的”的价格,是项目建设法人对划人标内的全部项目实施招标的期望价。水电站建设根据工程特点划分“标的”,一个标的只能有一个标底。在欧美国家是市场行情预测价,在中国.标底是用定额等计价标准编制的标准价格。标底应符合价值规律,有利于竟争和保证工程质量。一般控制在批准的概算限额内。在评标过程中标底是衡量投标报价是否合理的基准。标底必须保密。 标底由项目建设法人自行编制或委托具有资质的咨询单位编制。编制依据为:招标文件(包括标底内容.商务条款,技术条款,施工图纸,工程量清单等)、施工条件、当前施工技术和价格水平、法定的或合理的取费标准。标底编制方法采用制造成本法.包括直接成本(人工、材料、机械费用成本)和间接成本,并在总成本上加上必要的加价,包括承包方的总部管理费、不可预见费、利润、税金等。人工、材料、机械消耗量应是本工程标所消耗的必要劳动量,可根据国家和行业部门颁发的现行预算定额确定;或根据工程实际情况计算所需资源的配置。标底工程量采用国家或行业标准计算确定。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条