2) wall caving management
片帮管理
4) rib spalling
片帮
1.
According to the actual situation of rib spalling in high caving face in Sihe Coal Mine,after the mechanical analyzing,this article discussed the mechanism of rib spalling,the factors which affected the spalling,and the prevention and cure measure.
根据寺河矿大采高工作面煤壁片帮的实际情况,通过建立大采高片帮的力学模型,探讨了大采高片帮机理、影响因素及片帮的防治措施。
2.
Through observing and analyzing to roof and wall of spot in 6114 workface,this paper sum up rules and features of rib spalling and roof fall under complicated geology condition in sub-level caving mining workface,it raises a series of roof control measures and gets good result.
通过对 6 114工作面顶板、煤壁现状的现场观测和理论分析 ,总结出了复杂地质条件下综放工作面煤壁片帮、端面顶板冒落的规律和特点 ,提出了一系列复杂地质条件下综放工作面顶板控制措施 ,现场应用后取得了较好的效
5) rib fall
片帮
1.
The characters, damage and cause of rib fall at blasting face were analysed, and preventive measures were put forward, which has some reference value for other similar condition mines.
针对炮采工作面片帮特点、危害、原因进行深入分析,并提出相应的防范措施,对类似工作面片帮现象的防治具有借鉴意义。
6) coal wall spalling
煤壁片帮
1.
With the chemical grouting and reinforced technology for the coal and rock masses,the stability of the coal and rock mass was improved and the roof accidents due to the coal wall spalling was eliminated,which had ensured the successful mining operation of t.
梧桐庄矿311综采工作面煤层顶板破碎、开采煤层倾角达到20~30,°工作面煤壁片帮严重、冒顶事故频繁。
2.
In order to control the coal wall spalling in the fully mechanized high cutting longwall coal mining face,with the theoretic anal- ysis,numerical simulation,site measurement and other research methods,the paper studied the coal wall spalling mechanism of the fully mechanized longwall coal mining face.
为控制大采高综采工作面煤壁片帮,通过理论分析、数值模拟、现场实测等研究方法。