1) grouting connection
灌浆连接
1.
The technology of the grouting connection between the pile foundation and the jacket for the offshore wind turbine is summarized herein,and then the technology is discussed from the aspects of the grouting material,construction process;function of the shear key,design of the internal structure of the annular space,etc.
对海上风机桩基础与导管架的灌浆连接技术进行了总结,并通过室内试验和有限元计算分析,从灌浆材料、施工工艺、设剪切键的作用和环形空间内部结构设计等方面,对桩基础与导管架的灌浆连接技术进行探讨。
2) grouted tubular connections
灌浆套管连接
1.
The development of grouted tubular connections in China and abroad is presented in this paper.
概述国内外灌浆套管节点技术的发展过程,介绍了各种灌浆套管连接形式在生产和施工应用中存在的问题及其对策。
3) contact grouting
接触灌浆
1.
Application of FUKO tubes to steel penstock contact grouting in Xiaolangdi Water Diversion Power Generation;
FUKO管在小浪底引水发电压力钢管接触灌浆中的应用
2.
Sensitivity analysis of contact grouting indicators in steep section of high arch dam
高拱坝陡坡坝段接触灌浆指标敏感性分析
3.
According to the problems encountered in bedrock grouting construction of one reservoir from three aspects: contact grouting, mudding and mud leakage analysis is made; at the same time corresponding grouting methods are proposed in view of various geological conditions.
针对某水库基岩灌浆过程中出现的实际问题,从接触灌浆段、绕塞返浆、基岩中大量漏浆三方面进行了分析,提出了根据不同地质情况的相应灌浆方法,经实际运行观测,指出该基岩灌浆处理是成功的,完全达到了设计要求。
4) joint grouting
接缝灌浆
1.
The application of joint grouting technique in concrete dam construction of Xixiayuan project;
西霞院工程混凝土坝段接缝灌浆简介
2.
Supervision of joint grouting construction of I&Ⅱ bidding section of TGP;
三峡大坝I&IIB标接缝灌浆施工监理
3.
Dam joint grouting in Wanjiazhai water complex;
万家寨水利枢纽工程大坝接缝灌浆
5) joint grout
接缝灌浆
1.
533 M m3 , and water cooling and joint grouting in concrete structure at the middle section of it were first applied in the world; the transverse cofferdam that should be placed within 4 months has a maximum height of 115 m with a crest length of 580 m and a volume of 1.
在纵向围堰中部的坝身段碾压混凝土结构内首次实现通水冷却和接缝灌浆。
2.
By using emulative visco elasticity three dimension finite element method, the water pipe cooling for joint grouting of concrete dams has been studied in this paper.
采用全过程仿真粘弹性空间有限单元法对接缝灌浆水管冷却问题进行了计算研究 ,对冷却水温、冷却延续天数进行了敏感性分析 ,提出了只进行一期水管冷却 ,并在适当“超冷”情况下进行大坝接缝灌浆的建议 ,不但简化了施工步序 ,也有利于大坝的整体性 ,计算研究结果可供混凝土坝施工设计参考应用 。
6) connecting grouting reservior
联接灌浆
补充资料:接触灌浆
接触灌浆
contact grouting
J leehu guonJ一ong接触瀚桨(eontaet grouting)在岩石上或钢板结构物四周浇筑泥凝土时,棍凝土干缩后,对混凝土与岩石或钢板之间形成缝隙的灌策。 接触灌浆的主要作用是填充缝隙,增加猫着力和加强接触面间的密实性,防止漏水。 在岩石地基上建造混凝土坝,当混凝土体积收缩后,两者之间会产生缝隙,对于这类缝隙需要进行接触灌浆. 在岩石比较平缓部位,接触灌浆常与岩石中的帷幕灌策结合进行,将坝体混凝土与岩石的接触部位,作为一个灌浆段,段长不超过Zm,单独进行灌浆。 在坝肩岩石边坡陡于45。的部位,接触灌浆的设计和灌浆方法与接缝灌浆类似,采用预埋灌浆盒或其他方法,也有的采用浇筑混凝土后再钻孔的方法,主要是需在接触部位形成出浆点或出浆线,也设!有进浆管、回浆管、排气管。待混凝土达到设计规定的温度后,即进行灌浆。 在钢管或钢板结构物周围浇筑混凝土,当混凝土体积收缩后,两者间同样地会产生缝隙,对此缝隙也要进行灌浆。其施工程序为:①在钢板上锤击检查,画出脱空区。②视脱空区面积的大小,确定孔数,布置孔位。每个脱空区至少布置两个孔,其中一个为灌浆孔,靠近脱空区的底部,另一个为排气孔,位于脱空区的顶部。③钻孔。④灌浆。 灌浆施工自下端开始,逐渐向上。为了防止浆液沉积析水,致使浆体凝固后仍留有空隙,故采用浓的水泥浆灌注。