1) composite shear wall with concrete filled steel tube columns
方钢管混凝土约束端柱组合剪力墙
1.
Both material nonlinearity and geometric nonlinearity being taken into consideration, mechanical analysis of composite shear wall with concrete filled steel tube columns is done by means of a kind of software for finite element analysis, ABAQUS, with the calculation results being roughly consistent with the testing results.
在考虑材料和几何非线性的基础上,通过有限元分析软件ABAQUS对方钢管混凝土约束端柱组合剪力墙进行力学分析,对计算结果和试验结果进行比较,基本吻合。
2) shear wall with CFST columns
钢管混凝土组合剪力墙
3) steel plate-concrete composite wall
钢板-混凝土组合剪力墙
1.
Experimental study on shear behavior of steel plate-concrete composite wall;
钢板-混凝土组合剪力墙受剪性能试验研究
4) steel tubed SRC columns
钢管约束型钢混凝土柱
5) concrete-filled steel tubular column embedded shear-wall
内置钢管混凝土剪力墙
6) CCFT column
约束钢管混凝土柱
1.
The CCFT column system combines the advantages of conventional CFT column and tubed column systems and overcomes the defects in earthquake resistant behavior of the conventional concrete filled steel tubes.
本文提出了一种更适合抗震设计的新型钢管混凝土体系———约束钢管混凝土柱体系。
补充资料:剪力墙
剪力墙 shear wall 房屋或构筑物中主要承受风荷载或地震作用引起的水平荷载的墙体。防止结构剪切破坏。又称抗风墙或抗震墙、结构墙。分平面剪力墙和筒体剪力墙。平面剪力墙用于钢筋混凝土框架结构、升板结构、无梁楼盖体系中。为增加结构的刚度、强度及抗倒塌能力,在某些部位可现浇或预制装配钢筋混凝土剪力墙。现浇剪力墙与周边梁、柱同时浇筑,整体性好。筒体剪力墙用于高层建筑、高耸结构和悬吊结构中 ,由电梯间、楼梯间、设备及辅助用房的间隔墙围成,筒壁均为现浇钢筋混凝土墙体,其刚度和强度较平面剪力墙高可承受较大的水平荷载。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条