说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 财务决算准备工作内容
1)  Financial final account
财务决算准备工作内容
2)  final accounts
财务决算
1.
The paper firstly introduces the importance of final accounts for completed project, and points out the main problems of final accounts work existing in current government investment projects in terms of over time report, non-standard compilation and illegal financial management.
阐述了建设项目竣工财务决算的重要性,指出当前的政府投资项目决算工作主要存在编报不及时、编制不规范和财务管理不合规等问题,进而有针对性地提出了通过加强职能部门的管理协调、建立健全内控制度和重视业务人员的录用与培训来解决这些问题。
3)  financial work
财务工作
1.
Fiscal authority of middle rank, characterized by good performance, strong concept of policy and vocational morality as well as by strong sense of management, can do well in the financial work for the institiute.
作为中层领导的财务主管不仅要具备良好的业务素质、较强的政策观念和职业道德水平 ,还要有较强的管理意识 ,才能做好本单位的财务工
4)  Finance Work
财务工作
1.
We must do more research and set practical countermeasures to prevent and solve corruption so as to make college finance work healthy and ordered.
对此,必须认真研究,制定切实可行的对策,妥善予以解决,以保证高校财务工作的健康、有序运行。
5)  preparatory work
准备工作
1.
To carried on the soda-wash tower in the open-air scene which three sections of groups welded to carry on the before the load some preparatory work design and the computation,and has carried on the induction summary to the load process operation,the guarantee load security techinical measure was proposed.
对在露天现场进行三段组焊的碱洗塔进行了装车前一些准备工作的设计和计算,并对装车过程的操作进行了归纳总结,提出了保证装车安全的技术措施。
2.
This paper introduces the preparatory work before the installation of CIS combined electrical apparatus, and expounds the procedures of the installation of CIS combined electrical apparatus.
介绍了GIS组合电器设备安装前的准备工作,阐述了GIS组合电器设备的安装程序。
6)  preparation work
准备工作
1.
Therefore, the author introduced pre-drilling preparation work and 4 kinds of zone sticking methods, which were stratum reflected wave group tracing method, lithology standard horizon and reference horizon correlation method, sedimentary rock cycle correlation method, and well logging curve feature correlation method, summarized and prov.
对取心前的准备工作以及4种卡层方法(地层反射波组追踪法,岩性标准层、标志层对比法,沉积旋回对比法,测井曲线特征对比法)进行了详细介绍。
2.
Technical preparation work is very important, and it is a precondition of ensuring project progress and quality, decreasing project cost and offering good field HSE management.
安装工程开工前的技术准备工作非常重要,它是保证工程进度、工程质量、降低工程成本、搞好现场HSE管理的先决条件。
补充资料:财务
  关注财务状况...
当您拥有或管理一家小型企业时,您会发现对时间和人才的需求无处不在。但要保持小型企业的日常良好运作最终还是要取决于其财务管理状况。您的现金流状况如何?您的存货投资是否过多?借助于此页上的工具和建议,您将能够集中关注财务信息,以便更好地制定业务决策。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条