说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 桩静载试验检测
1)  pile static load test
桩静载试验检测
1.
DJM in dealing with the construction of soft soil has been widely used to introduce the principle of DJM strengthening the foundations,construction techniques,pile static load test,can greatly improve the bearing capacity of composite foundation,reinforcement of the desired effect.
粉喷桩在处理软土地基施工中得到了广泛运用,介绍粉喷桩加固地基原理,施工工艺,桩静载试验检测,可以大大提高复合地基承载力,取得理想的加固效果。
2)  static load test detection
静载试验检测
1.
Combined with the municipal conveyance bid 3 project of Hongqiao comprehensive transportation hub, according to the supervisory process and methods strictly, adopting appropriate measures and applying ultrasonic testing, low strain detection, high strain detection and static load test detection, etc.
在虹桥综合交通枢纽市政配套工程3标工程PHC管桩质量监理控制中,严格按照监理程序与方法,采取相应措施,综合运用超声探伤、低应变检测、高应变检测、静载试验检测等多种检测技术,保证了桩身完整性和承载力。
3)  pile plate load test
桩静载试验
1.
This paper uses back-analysis method to determine the values of soil parameters (modulus of compression and poisson s ratio)based on the load-displacement curve of pile plate load test.
本文根据桩静载试验的 P—S 曲线反分析地基土体力学参数(压缩模量 E。
4)  dead-load experiment of pile foundation test
静载荷桩基检测实验
5)  pile loading test
基桩静载试验
1.
Based on the data from observation of the pile loading test,an objective function was established.
由基桩静载试验数据建立目标函数,用非线性最小二乘法求解该目标函数的极小值,从而得到基桩极限荷载值。
6)  the static load testing pile
桥桩静载试验
补充资料:歼7飞机静力试验


歼7飞机静力试验


歼7飞机静力试验
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条