1) newly built wastewater treatment plant
新建污水厂
1.
An inverse AAO process in a newly built wastewater treatment plant was modeled based on ASM2D.
基于ASM2D模型建立了上海某新建污水厂倒置AAO流程的数学模型,并采用该厂进、出水设计数据对模型进行校正,其中,ASM2D各组分浓度分布参考文献值。
3) Construction and operation of sewage treatment plant
污水厂的建设与运营
4) sewage sludge
污水厂污泥
1.
Kinetic modeling of the low-temperature pyrolysis of sewage sludge;
城市污水厂污泥低温热解动力学模型研究
2.
Advances in study of concentrations of dioxin-like compounds in sewage sludge;
污水厂污泥中类二噁英类物质污染水平的研究进展
3.
Technology research on waterworks sludge and sewage sludge for ceramsite
给水厂与污水厂污泥制陶粒技术研究
5) municipal sewage sludge
污水厂污泥
1.
Research on technology and batch formula of sintering municipal sewage sludge for manufacturing haydite
采用污水厂污泥制陶粒的烧结工艺及配方研究
2.
In the experiment,sampling plants grow in the beach sand mixed with Shanghai quyang municipal sewage sludge and most plants grow well.
选取了上海市曲阳污水厂污泥和潮滩沙土的混合土壤做土地种植试验 ,结果表明绝大部分的植物在污泥和潮滩沙土混合土壤上能够存活 ,并生长良好 。
6) wastewater treatment plant
污水厂
1.
In view of the low influent water quantity and low organic matter concentration,A2/O process in a wastewater treatment plant was started up and operated by activated sludge inoculation training methods.
某A2/O工艺污水厂在进水水量不足,有机物浓度低,采用活性污泥接种培养方法启动运行,通过采取投加营养源,减小曝气量和间隔进水等措施,系统成功启动,考察了在水量不足,有机物浓度低时,系统培养过程中MLSS、MLVSS、COD、TP、NH3-N等参数的变化趋势。
2.
Method of SRT was used to minimize the excess activated sludge production of wastewater treatment plant.
为了解决污水厂生化系统剩余污泥产量过多的问题,采用延长污泥龄(SRT)的方法,对剩余污泥减量化的影响进行了研究。
3.
Because the wastewater treatment plant (WWTP) in cold area is difficult to start up with long time to be taken, the bio-augmentation technology with simultaneous addition of activated liquid strain, biological bacterial agent,and activated sludge into AO basin was firstly adopted in the start-up of Harbin Taiping WWTP.
针对寒冷地区污水厂启动困难、时间长的难题,在哈尔滨太平污水厂启动过程中,首次采用活化菌液、生物菌剂与活性污泥同时投加的生物强化技术,在平均气温为10℃、生化池进水温度为13℃的低温条件下,采用先异步后同步的复合培菌方法,成功进行了AO池活性污泥的培养驯化。
补充资料:兰州炼油厂的污水处理厂
兰州炼油厂的污水处理厂
兰州炼油厂的污水处理厂
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条