1) rig hook load
钻机大钩载荷
1.
Calculation method of rig hook load on deepwater drilling platform
深水钻井平台钻机大钩载荷计算方法
2) hook load
大钩载荷
1.
In accordance with analysis of hook load(160t) of MR-7000 workover rig and designed drilling tools friction in well S-18,the load capacity and torque ability of the workover rig can meet the need of lifting ability of normal tripping and drilling operation,and the servicing rig has acertain capacity of treatment downhole accident.
根据MR - 70 0 0修井机大钩载荷 (16 0t)与沙 18井设计钻具摩阻分析 ,该修井机承载能力及扭矩能力可满足该井正常的起下钻及钻进作业的提升能力要求 ,并具有一定的处理井下事故能力。
2.
Predicting and controlling the hook load and casing running depth in the process of completing extended reach wells is one of the key factors to ensure the completion to be successful.
大位移井在套管下入过程中大钩载荷和套管可下入深度的预测是大位移井成功完井的关键因素之一。
4) Drilling Rig Load
钻机荷载
5) maximum coupling load
车钩最大载荷
6) hook load rating
大钩额定载荷
补充资料:大钩召印
【大钩召印】
(印相)作内缚拳。竖右手之头指。少屈之作钩形。是除盖障佛顶,及九方便中,奉请法身方便之印也。
(印相)作内缚拳。竖右手之头指。少屈之作钩形。是除盖障佛顶,及九方便中,奉请法身方便之印也。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条