1) spare parts supplied amount
备件补给数量
1.
A calculating spare parts supplied amount model based on marginal cost method is established and how to determine spare parts purchased amount based on limited support expenses is discussed.
建立了基于边际分析法确定备件补给数量的模型,探讨了基于有限的保障经费合理确定各类备件采购数量的问题,并通过示例分析在备件库存不为空和为空两种情况下备件补给数量的确定过程,仿真结果表明该法确定的采购方案较切合于实际情况。
3) replenishment
[英][ri'pleniʃmənt] [美][rɪ'plɛnɪʃmənt]
补给量
1.
Calculation and analysis of infiltration replenishment in river course;
河道渗漏补给量的计算与分析
2.
In terms of groundwater flow, infiltration of rainwater, leakage releasing water and other aspects this paper analyzes the factors influencing the replenishment of deep groundwater resources in order to enhance the calculation accuracy to provide reasonable foundation for exploitation of groundwater.
从地下水径流、降水入渗及越流补给等方面 ,对影响地下水资源补给量的主要因素作了分析 ,以提高水资源计算精度 ,为地下水的合理开发利用提供合理的依据。
3.
Based on application of the theory of water balance,quantitative research on the water balance and the dynamical characteristics of monthly evaporation and replenishment of mobile sandy land in the growing season is conducted.
利用水分分配箱对流动沙地土面蒸发量和入渗补给量的月动态特征及其水量平衡作了定量研究。
4) recharge rate
补给量
1.
This paper deals with the essential principle and method of radioisotope (tritium) applied to hydrogeogeological surveing of railway tunnel, The tritium content is used to calculate the relative age judge vertical zoning of hydrogeological features of groundwater controled by structure,and then calcutation vertical seepage velocity of groundwater, determine the recharge rate of groundwater.
本文简述了山岭隧道水文地质勘测中 ,应用同位素氚测试法 ,通过计算地下水生成的相对年龄、帮助了解地下水的垂直分带及判定构造控制地下水水量的水文地质特征 ,计算地下水垂直渗透速度及预测山岭隧道地下水的补给量。
5) Recharge increment
补给增量
6) replenishment quantity method
补给量法
补充资料:备件
预备着供更换的机件。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条