1) Technical innovation project
技措项目
2) measure program
措施项目
1.
With the Code of Valuation with Bill Quantity of Construction Works as the guide,the paper first overly analyzes the content of the detailed measure program,the establishment of criterion,the valuation principle and the valuation method,and then suggests some quote skills for the cost of measure program.
工程量清单计价是当前国际上普遍采用的工程计价形式,本文结合《建设工程工程量清单计价规范》的实施,对措施项目清单的内容、编制依据、报价原则以及计价进行了总体分析,提出了措施项目费的报价方法。
3) step item cost
措施项目费
1.
The analysis and research for compete force of step item cost in bid quoted price to bill quantity of construction;
工程量清单投标报价中措施项目费竞争力分析研究
2.
The step item cost,one of three important parts in the bill quantities of construction,was fully analyzed in this paper and its importance was specifically stressed in the building construction.
通过具体事例说明管理好工程量清单中措施项目费的重要性。
5) sports events
竞技项目
1.
On tacit knowledge in sports events and its revealment;
论竞技项目中的隐性知识及其显现化
6) technical item
技术项目
1.
Therefore there are so many technical items in its product standards to evaluate and control its quality and performances.
制动液的质量和性能直接影响汽车的行车安全,在其技术标准中有许多技术项目以评价其性能优劣。
2.
It analyzes the problems of evaluation of industrialization technical item of our country,builds and consummates the index system,which based on market orientation and converging technique,society benefit,law estate,economic benefit,risk factors and so on; and quantifies index system; on the base of the index system s dimension go back to one,it builds up the integrated evaluation model.
在分析我国产业化技术项目评价存在的问题的基础上,建立和完善了基于市场为导向的集技术本身、社会效益、法律状态、经济效益、风险等集成的产业化技术项目评价指标体系;并对各指标进行量化测定;在实现各指标量纲归一的基础上,建立了产业化技术项目综合评价模型。
补充资料:不合格品纠正措施(见纠正措施)
不合格品纠正措施(见纠正措施)
corrective actions for nonconforming product:see corrective actions
bul,卯ping jiuzhe叫euoshi不合格品纠正措施(~tive actions for non-印雨皿吨prt泪uct)见纠正措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条