1.
Taking the renovation engineering of a building heating heat source using one-pipe-series-loop system for research object,the design criteria of operational parameters of combined heat-supply system based upon water source heat pump and peak-shaving boiler and the restricted conditions of hot water flow rate are discussed.
以采用单管顺流式供暖系统的某建筑物供热热源改造工程为研究对象,探讨了水源热泵+调峰锅炉联合供热系统运行参数的设计基准及热水流量的约束条件。
2.
The run phase and regulation modes of combined heating system based on water source heat pump and peak-shaving boiler are studied,and the influencing parameters and restricting conditions for the operation cost of the combined heating system are analyzed.
对水源热泵+调峰锅炉的联合供热系统的运行阶段、调节方式进行了研究,分析了联合供热系统运行费的影响参数及约束条件。
6) boiler regulation
锅炉调节
补充资料:单机试车
分子式:
CAS号:
性质:指安装后的单台机械、机组在现场以水或空气为介质进行的空负荷或带负荷的试运转。目的是检验其除受介质影响外的机械性能和制造、安装质量。
CAS号:
性质:指安装后的单台机械、机组在现场以水或空气为介质进行的空负荷或带负荷的试运转。目的是检验其除受介质影响外的机械性能和制造、安装质量。