说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 坝缝止浆
1)  slot grouting
坝缝止浆
2)  joint-grouting in concrete dam
混凝土坝接缝灌浆
3)  dam crack
大坝裂缝
1.
Research on dam crack and treatment measures of Xiaoqinggou reservoir
贵州省大方县小箐沟水库大坝裂缝研究及处理方案
2.
Firstly, the difference of standard and variable precision rough sets was introducd, the VPRS model of dam crack was established, and then the main factors were extracted through discretization and ruduction, finally a practical application of the model was illustrated.
简要分析了裂缝开度变化的影响因素在工程中的重要意义,针对传统数值计算方法的不足提出了大坝裂缝的变精度粗集模型。
4)  crack on dam surface
坝面裂缝
5)  joints of dam
坝体分缝
6)  earth dam cracks
土坝裂缝
1.
And the paper gave simple discussion on the prevention of earth dam cracks, providing references to the design, construction, daily management and regularl observation of dam cracks.
土坝裂缝直接危及大坝安全,应采取相应的处理方法和措施。
补充资料:接缝灌浆
      用压力将水泥浆液灌注到混凝土坝体接缝中的工程。混凝土坝施工时,为防止产生温度裂缝和受到浇筑能力的限制,常以横缝将坝体分成若干坝段,每一坝段又以纵缝分成几个坝块,采用分段、分块、分层交替上升的柱状浇筑法(见混凝土施工)。为保持坝体在运行时的整体性和有效地传递应力,需要在大坝投入运行前对这些接缝进行灌浆。有的重力坝只要求进行纵缝灌浆,横缝不灌浆,作为伸缩缝,设有止水。接缝灌浆均采用水泥浆液。为保证灌浆质量,须在坝体内部混凝土温度达到稳定值,或混凝土龄期超过六个月,并且灌缝两侧及顶层盖重混凝土的温度达到设计规定值时,方可进行灌浆。因此,接缝灌浆常是水库开始蓄水的控制条件。灌浆需自下而上分区进行。通常用止浆片将各缝面划分为若干封闭的灌浆区,一个灌浆区的高度约10~15m,面积为200~300m2。灌浆管路可采用预埋铁管或塑料管,也有采用塑料拔管,即先埋入塑料软管,并充气,在混凝土终凝后即将软管拔出形成通路的办法。混凝土浇筑过程中,要注意防止堵塞灌浆管路系统。接缝灌浆的质量需通过对施工记录资料的分析、钻孔取样、压水检查和缝面凿槽检查等成果综合评定。检查工作在灌浆结束28天以后进行。有的工程还考虑进行重复灌注的措施。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条