1) Tacheng Hydropower Station
塔城水电站
1.
Research on Formation Mechanism and Space Distribution Characteristics of Deep Overburden Layer in River Bed of Tacheng Hydropower Station in Jinsha River
金沙江塔城水电站河床深厚覆盖层的形成机制及空间分布特征的研究
2) Songta Hydropower Station
松塔水电站
1.
Analysis on the Dam Bypass Seepage on Right-bank in the Dam Site of Songta Hydropower Station
松塔水电站坝址区右岸绕坝渗漏分析
3) Zecheng Hydropower Station
泽城水电站
1.
Comparison and Selection of the Type of Junction Dam in Zecheng Hydropower Station
泽城水电站枢纽坝型比较与选择
4) hydropower station intake tower
水电站进水塔
1.
Processing of the hydropower station intake tower s foundation of BMPDP;
百色水利枢纽水电站进水塔基础处理
5) Talinxi hydroelectric station
塔林西水电站
1.
This paper introduces the general situation of the project in Talinxi hydroelectric station and analyzes the relation between project benefit and district economical development.
介绍了塔林西水电站的工程概况;分析了其工程效益及区域经济发展的关系。
6) Barotha Hydropower
巴罗塔水电站
1.
Design and Application of the Building-Automation System for Pakistan Barotha Hydropower Plant;
巴基斯坦巴罗塔水电站楼宇自控系统的设计与应用
补充资料:塔城
塔城
Tacheng
Taeheng塔城(Tacheng)中国新疆维吾尔自治区西北边睡重镇。因附近有塔尔巴哈台山得名。东南距鸟鲁木齐588千米,西部和北部与哈萨克斯坦接壤。辖3个街道办事处、6个乡、9个农牧场。面积4 353平方千米,人日13.67万,其中城区面积10平方千米,人口5.33万(1993)。有哈萨克、汉、回、维吾尔、俄罗斯等25个民族,其中汉族占人口的64%。清乾隆三十一年(1766)塔尔巴口合台参赞大臣府移驻此地,1888年设塔城直隶厅。1913年改设塔城县。1984年县改市,为塔城行署所在地。地处塔城盆地西北缘,地势北高南低。北部是塔尔巴哈台山区,哈孜克提山海拔2 148米,是全市最高山氧南部为额敏河冲积平原和低洼沼泽地。有喀浪古尔、阿不都拉、锡伯图、乌拉斯台4条河流由北向南纵贯市境,注人额敏河。城区坐落在中西部,海拔540米。属中温带大陆性半干旱气候,年平均气温8.3℃,1月平均气温一13.7℃,7月平均气温28.3℃,年平均降水量397.4毫米。农业主产小麦、玉米等,是新疆粮油墓地之一。畜牧业盛产优质细毛羊和牛。工业有建材、电力、食品、机械、皮革、酿酒、粮食加工等。交通以公路为主,可西通哈萨克斯坦阿亚古斯,东南经额敏通乌鲁木齐、伊宁、阿勒泰等地。 (孙国校)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条