1) rockfill dam with core wall
心墙石碴坝
2) embankment dam with clay core
粘土心墙石碴坝
3) core rockfill dam
心墙堆石坝
1.
Based on actual engineering of 350m high core dam building on deep overburden foundation,the stability of dynamic strength of sensitive materials,which existed in super-high core rockfill dam located in meizoseismal region and overburden foundation is discussed.
以建立在深厚覆盖层上350 m级心墙堆石坝工程实例为据,探讨了该类位于强震区域和深厚覆盖层上的超高心墙堆石坝中敏感性材料(心墙料、反滤料和砂层)的动强度稳定性。
4) core type rockfill dam
心墙堆石坝
1.
Influences of double yield surface model parameters on calculated settlement of core type rockfill dam;
双屈服面模型参数对心墙堆石坝计算沉降的影响
2.
The calculation and analysis of the core type rockfill dam of Lubuge Hydropower Station are conducted by the programs of total stress method and effective stress method.
鲁布革水电站心墙堆石坝采用总应力法和有效应力法计算程序进行计算和分析。
5) core rock-fill dam
心墙堆石坝
1.
Shaking table model tests of Shuangjiangkou core rock-fill dam
双江口心墙堆石坝振动台模型试验研究
2.
Research on the maximum anti-seismic capability of high earth core rock-fill dam
高心墙堆石坝的极限抗震能力研究
3.
The core rock-fill dam construct-planning of NuoZhaDu Hydropower station is instructed in this paper.
简要介绍了糯扎渡水电站心墙堆石坝坝体填筑施工的设计规划,并且主要叙述了坝体填筑施工的上坝道路布置、物料准备、填筑施工工艺、填筑分期及分区的优化、工程开挖料利用等坝体施工规划的设计成果。
6) core of earth-rockfill dam
土石坝心墙
1.
Research progress of hydraulic fraturing in core of earth-rockfill dam;
土石坝心墙水力劈裂的研究进展
2.
Research progress of hydraulic fracturing in core of earth-rockfill dam
土石坝心墙水力劈裂研究探讨
3.
The research status of hydraulic fracturing in core of earth-rockfill dam is briefly reviewed,and the mechanisms,the conditions and the influence factors of hydraulic fracturing are induced.
简要评述了国内外关于土石坝心墙水力劈裂的研究现状,归纳了土石坝心墙水力劈裂在发生机理、发生条件和影响因素等方面的研究成果。
补充资料:粘土心墙坝
粘土心墙坝
earth dam with clay core
填筑质量不良将使沉陷量过大。建坝初期易使心墙由于不均匀沉陷而出现纵向裂缝;后期由一于心墙固结缓慢,沉陷量常大于同期坝壳沉陷量,此时,将发生拱效应,使心墙出现隐蔽的水平张拉裂缝而造成渗水通道,甚至引起心墙破坏 粘土心墙坝的渗透及稳定计算见土坝渗流及坝坡稳定。(陈吉社)n iantu xinq一angba粘土心墙坝(earth dam with elay eore)用填筑于坝体中心的渗透系数较低的粘性土体作为防渗设备的上石坝。此类坝由心墙或斜心墙防渗;上下游坝壳支撑心墙保持坝体稳定:下游坝趾设排水以排除坝体、坝基渗水,并11r保护下游坝脚不受冲刷(见图)。当坝址附近有大量透水砂砾料和较少的粘性粘上心墙;止渡)公不透水层枯土,心墙坦土料,地基的预估沉陷量偏大时,采用这种坝型是适宜的。与均质土坝相比,其下游浸润线较低,边坡可陡些,而上游边坡陡于斜墙坝,故工程量常较均质土坝、粘土斜墙坝少,为此,高土石坝多趋向于采用心墙坝。中国碧口水电站及陕西石头河水库大坝,坝高超过100米,都采用心墙坝。 粘土心墙叮垂直或略向上游倾斜布置,其顶部高程不低于最高库水位,顶宽考虑施工要求不小于2米,自墙顶向下游逐渐加厚,薄心墙边坡可陡于1;0.2,厚心墙边坡可达l;1,甚至更缓。心墙厚度不得小于承受水头与心墙土料允许渗透坡降的比值。心墙与坝壳间一般设置反滤过渡层,心墙底部用截水槽与坝菇不透水层相连接。当不透水层为基岩时,为防止集中渗流对心墙底部粘土的冲刷,常设混凝土垫或混凝土齿墙。心墙与岸坡的连接处可扩大断面以延长渗径,防止接触冲刷。 心墙土料可就地取材,以残积土、冰啧土、沉积土为好,风成土及湖积土较差。其物理指标以粘土含量3()一5。%、渗透系数1又10一6一1丫1()一”厘米/秒、含水量15一25%为宜坝壳llf用一种或多种透水料如砂、砾(卵)石、风化石碴等填筑。坝壳料的渗透系数应比心墙料大1()。倍以上,以加强防渗效果;应具有较高的抗剪强度,以利于稳定;颗粒级配应连续,以利于压实「此外,对影响抗剪强度和渗透稳定性的细粒含量应限制在规定范围之内。心墙粘土宜用羊足碾或气胎碾压实:砂石料及块石、石碴分别用振动碾压实。若
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条