说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 北大港北坡
1)  the north slope of Beidagang
北大港北坡
1.
Reservoir prediction by combining core-logging-seismic facies for the north slope of Beidagang
北大港北坡“三相”结合预测沙二段储层
2)  The north slop of Gangxi
港西北坡
1.
The north slop of Gangxi is located in the northeastern tectonic belt of the Beidagang buried hill.
港西北坡位于大港探区北大港潜山构造带东北翼,沙三段沉积前与其沉积时期,受断裂活动迁移性控制,发生多次构造掀斜与构造反转,沙三段遭受多期剥蚀,在其顶、底及内部存在不整合界面。
3)  Beidagang
北大港
1.
Provenance analysis of the shahejie Formation and the dongying Formation in Beidagang
北大港东营组和沙河街组物源分析
4)  Nandagang and Beidagang
南、北大港
1.
The 1∶50000 Baishuitou-Qikouzhen Sheet, covering an area of ~400 km2, is a component part of the paleo-lagoon of the Nandagang and Beidagang on the west coast of the Bohai Bay.
以1∶5万白水头-歧口镇幅175个区域地质调查点的多维数据——点的坐标、点的地表与所揭露的湖底板的高程和区域性年代学框架——为基础,对南、北大港古湖其余约880km2未实测区域布设控制贝壳堤和湖底板高程的虚拟三维地质点275个(虚拟点的坐标、贝壳堤顶部与湖底板的高程)。
5)  Beidagang Reservoir
北大港水库
1.
Study on Water Storage of Beidagang Reservoir and Real-time Flood Dispatch;
北大港水库蓄水及洪水实时调度研究
2.
This paper describes the dynamic process in the simulation of water quality of Beidagang Reservoir,a reservoir for the storage of water from the Yellow River for the water supply in Tianjin and a part of SouthNorth Water Transfer Project.
建立水动力、水体污染物输运及底泥污染物输运数值模型,采用有限差分与有限体积相结合的方法,对北大港水库氯离子进行动态数值模拟。
3.
This paper takes Beidagang reservoir as an example, and describes the dynamic process in the simulation of water quality, and the general rules about the release of contamination in sediment were obtained.
本文以北大港水库为例,运用数值模拟方法进行了水质模拟研究,并通过优化调度方式,确保水库水质安全,并通过对底泥污染物释放的模拟分析得出底泥释放的影响因素,为水质安全研究提供科学依据。
6)  Banqiaobeidagang
板桥北大港
1.
Prediction of oil and gas pool size and resource structure in Banqiaobeidagang;
板桥北大港成藏体系资源结构定量预测
补充资料:DEQ 目的港码头交货 (……指定目的港)

  %26#8220;目的港码头交货%26#8221;是指卖方在指定的目的港码头将货物交给买方处置,不办理进口清关手续,即完成交货。卖方应承担将货物运至指定的目的港并卸至码头的一切风险和费用。
  DEQ术语要求买方办理进口清关手续并在进口时支付一切办理海关手续的费用、关税、税款和其他费用。   这和以前版本相反,以前版本要求卖方办理进口清关手续。
  如果当事方希望卖方负担全部或部分进口时交纳的费用,则应在销售合同中明确写明。
  只有当货物经由海运、内河运输或多式联运且在目的港码头卸货时,才能使用该术语。但是,如果当事方希望卖方负担将货物从码头运至港口以内或以外的其他点(仓库、终点站、运输站等)的义务时,则应使用DDU或DDP术语。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条