1) Shaxi shiplock
沙溪船闸
1.
Layout of filling and emptying system of Shaxi shiplock in Jialing River
嘉陵江沙溪船闸输水系统布置研究
2) Yuxi ship-lock
裕溪船闸
1.
According to grey disaster prediction principle and the characteristic of linear regression to suit short-term prediction, this paper puts out the combination forecast method and applies it in Yuxi ship-lock throughput prediction modeling.
本文依据灰色灾变预测原理,结合线性回归适用短期预测的特点,提出了一种新的组合预测方法,并应用于裕溪船闸通过量预测的建模中。
3) sediment discharge of navigation lock
船闸泥沙处理
4) Shaxi
沙溪
1.
Heat Evolution from Intrusion to Mineralization in Shaxi Porphyry Copper (Gold) Deposits, Anhui Province;
安徽沙溪斑岩铜(金)矿床成岩成矿热历史探讨
2.
The adakite and mineralization of the Shaxi porphyry copper-gold deposit,Central Anhui;
埃达克岩与皖中沙溪斑岩铜矿的成矿作用
3.
Study on navigable ship model test of approach channel in Jialing Shaxi Project
嘉陵江沙溪枢纽引航道船模通航预报试验研究
5) Beixi sluice
北溪水闸
1.
This article deals with the three-dimensional virtual simulation management system for Beixi sluice on Jiulong river in Fujiang which is developed based on technologies of computer simulation, geography information and database.
阐述了采用最新的计算机虚拟仿真、地理信息和数据库等技术,研制福建省九龙江北溪水闸三维仿真管理系统,给出了系统的功能、总体框架、数据流程及关键技术,实现了系统的具体功能。
6) lock head
船闸闸首
1.
Application of VB and TrueGRID to 3D finite grid automatic mesh generation for lock head
VB与TrueGRID软件在船闸闸首三维有限元网格自动剖分中的应用
补充资料:裕溪口港
安徽省重要水陆中转港。位于长江左岸,裕溪河入江处。地当老淮南铁路终点。港区地面平坦,江面宽阔,水陆运输条件较优。 裕溪口港是1958年建成的中国第1座机械化内河转运港,有码头9座。其中有客运(区间)码头1座;泊位各为1000吨级的货运码头5座,主要装卸化肥、矿石、钢材、木材、水泥等;煤炭专用码头3座,可供1000~3000吨级驳船同时装煤,为全国大型内河煤码头之一,主要承担淮北、淮南煤矿到华东的煤炭运输中转任务。裕溪口原属和县地,1958年后划归芜湖市。现为芜湖港作业区之一。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条