1) coking production
焦化生产
1.
Application status and countermeasure analysis of coal petrology in coking production
焦化生产中煤岩学应用现状及对策分析
2) commercial coke oven
生产焦炉
1.
The function of a 40 kg charge test coke oven, and the test process and philosophy are introduced to predict the strength of the coke from a commercial coke oven.
介绍了40kg试验焦炉的作用及用试验焦炉预测生产焦炉焦炭机械强度的试验过程与原理,通过对试验数据的处理,得出了生产焦炉与试验焦炉所炼焦炭的机械强度关系的公式,可指导生产焦炉的实际生产。
3) coke oven operation
焦炉生产
1.
The paper introduces the composition,characteristics,function and application effect of the computer management system in coke oven operation.
介绍了焦炉生产过程计算机管理系统的组成、特点、功能及使用效果。
4) machine processed coke production
机焦生产
5) Tar production
焦油生产
6) coke production
炼焦生产
1.
However, coke production process is complicated and the production environment is very bad, which leads that the automation level of coke production in China is not high and a series of automations are hard to achieve.
然而炼焦生产工艺复杂,生产环境恶劣,这使得我国炼焦生产自动化水平不高,一系列自动化技术难以实现。
补充资料:JIT准时制生产(及时制生产)
JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条