说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 普通剪力墙
1)  common shear wall
普通剪力墙
1.
As for shear wall with beams & column around,it will have much higher resistance than common shear wall under the influ-ence of horizontal quake.
随着高层建筑迅速发展,越来越多地采用钢筋混凝土框架—剪力墙结构,其周边有梁柱剪力墙在水平地震作用下比普通剪力墙承载力高,介绍该墙的抗震设计及构造要求。
2)  the limb of shear-wall
剪力墙墙肢
3)  shear wall
剪力墙
1.
Experimental study on seismic performance of RC shear wall joint with bi-directional single row of steel bars;
双向单排配筋剪力墙节点抗震性能试验研究
2.
State-of-the-art of high strength and high performance concrete shear walls;
高强高性能混凝土剪力墙的研究现状及展望
3.
Application of microplane models in the computation of shear wall structure;
微平面模型在剪力墙结构计算中的应用
4)  shearwall
剪力墙
1.
Elastic analysis of non-planar acting force for shearwall in large space residence;
大空间住宅剪力墙出平面受力弹性分析
2.
An experimental study on the seismic behavior of a 1/4 scale reinforced block masonry shearwall building model;
配筋砌块砌体剪力墙1/4比例模型房屋抗震性能试验研究
3.
On the Design of Frame-shearwall Structure;
浅论框架──剪力墙结构设计
5)  shearing force wall
剪力墙
1.
Application of grey system in decision-making on construction project of moulding board of shearing force wall;
灰色系统在剪力墙模板施工方案决策中的应用
2.
Analysis of mold expanding phenomenon of shearing force wall template;
剪力墙模板胀模现象分析
3.
Taking design of a high residential structure for example ,it introduces its ideas of structural design,illustrates process of designing some frame supporting shearing force wall structure and concludes several designing experiences.
以某商品住宅楼工程结构设计为例 ,介绍了其结构设计的思路 ,对部分框支剪力墙的结构设计过程进行了详细阐述 ,总结了几点设计体
6)  shear-wall
剪力墙
1.
Simplified analysis of the collapse of shelters attached to shear-wall structures with blast loadings;
冲击波作用下剪力墙结构人防地下室倾覆的简化算法
2.
Analytical model of predigested strut and tie model for shear-wall
基于STM的简化拉压杆剪力墙单元模型
3.
The factors sensitive to the analysis result of shear-wall structure are discussed,including the model of shear wall,the judgement for the reinforcing positions,the adjustment of internal forces and the calculation of bearing capacity,etc.
探讨了对剪力墙计算产生影响的主要因素,包括剪力墙的计算模型、底部加强部位的判断、内力调整、承载力计算等。
补充资料:柏林墙
柏林墙
Berlin Wall
    环绕西柏林的一道围墙。东德政府根据人民议院1961年8月12日通过的法令,于8月12~13日夜间修筑。目的是制止东德居民包括熟练技工大量流入西德。原为铁蒺藜围成的路障,后改筑成两米高、顶上拉着带刺铁丝网的混凝土墙。在正式的交叉路口和沿线的观察塔楼上设置警卫。1970年,虽然东西德之间关系有所改善,东德政府还是把柏林墙加高到3米以阻止居民逃向西方。到 1980年,围墙、电网和堡垒总长达1369千米。除筑墙外还严格限制西柏林与东德之间的人口流动。后根据东、西德政府 1971年12月20日签署的协议,限制略有放宽。1989年下半年,东欧各国政局剧变。民主德国在向德国西部移民浪潮的冲击下,于同年 11 月9日,将存在28年零3个月的柏林墙推倒,促进了德国的统一。
    
   

勃兰登堡门前的柏林墙

勃兰登堡门前的柏林墙

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条