说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 桥梁布置方案
1)  Bridge layout scheme
桥梁布置方案
2)  bridge scheme
桥梁方案
1.
Application of Fuzzy Optimization Theory in Bridge Scheme Selection;
模糊优选理论在选择桥梁方案中的应用
3)  bridge layout
桥梁布置
4)  layout plan
布置方案
1.
This paper introduces the main payout principles for the main workshop of 135 MW machine set,and draws the reasonable layout plan through comparing and optimizing the two layout plans.
介绍了电厂135MW机组主厂房的主要布置原则,并通过两个布置方案的比较优化后,得出合理的布置方案。
2.
Analyzing the relevant factors of logistics facility layout and based on Systematic Layout Planning method(SLP),the paper proposes a logistics facility layout procedure mode,analyzes and discusses the facility layout plan and evaluation in the procedure mode.
从物流设施布置相关因素分析入手,在SLP系统布置方法的基础上,提出了物流设施布置的程序模式,并对程序模式中的设施布置方案及评价进行了重点分析和探讨。
5)  scheme arrangement
方案布置
1.
This paper describes the scheme arrangement of construction settlement observation of Tan Shao Expressway, and put forwards the methods of preliminary analysis of foundation settlement data for dynamic control of embankment construction of the expressway based on the analysis of foundation settlement characteristics during construction.
介绍了潭邵高速公路施工沉降观测的方案布置情况 ,并在对施工中地基沉降特性分析的基础上 ,提出进行地基沉降数据初步分析的方法 ,用于潭邵高速公路路堤施工的动态控制。
6)  layout scheme
布置方案
1.
Research on layout scheme of gas turbine combined cycle units
燃气-蒸汽联合循环机组布置方案研究
2.
An experimental study was performed on the layout scheme of a pumping station to be built on the bank of a broad and shallow sediment-laden reach of the mainstream of the Yellow River,including the site selection,layout of water intake,simulation of floating ice flowing into the gate.
对黄河干流某宽浅多沙河段拟建泵站规划布置方案进行了泵站选址、取水头部布置、浮冰进闸模拟等的试验研究,试验结果表明:宽浅多沙河流岸边式取水泵站站址宜选在弯道顶冲点下游的送溜段;取水头部按迎水面与主流线平行的形式布置流态较为理想,采用叠梁闸形式可使洪枯水季节的取水安全及取水防沙得到最大限度的保证;岸边式取水泵站的进水流道会有浮冰进入,但数量远小于河道内的浮冰疏密度;站址区的岸坡防护与加固,应以不影响取水头部最佳水流条件为前提。
3.
This paper analyzes and approaches the layout from the angles of boiler thermal load,distribution of pulverized coal and investment ,qualitatively puts forward the following optimum layout schemes:(1)tube mills are transversely arranged in front of boiler and crossly connected with the corresponding burners(front-lef and rear-right ,or front-right and rear-left);(2)tub.
从锅炉热负荷、煤粉分配和投资角度对其进行分析探讨,定性提出球磨机炉前横向布置和同磨对应燃烧器全置炉后或全置炉前的优选布置方案,对同类型锅炉制粉系统的布置方案选择有一定的指导意义。
补充资料:高水桥(见军用桥梁)


高水桥(见军用桥梁)
high-level bridge

gQoshuiqiao高水桥(high一level bridge)桥梁。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条