1) Integrated Resource Strategic Planning
综合资源战略规划
1.
Study on Integrated Resource Strategic Planning of China in 2011-2015
我国“十二五”综合资源战略规划的思考
2.
Integrated Resource Strategic Planning(IRSP) and Smart Grid consist of Low-Carbon Electricity.
综合资源战略规划与智能电网构成低碳电力。
2) IRP
综合资源规划
1.
The electric power deregulation has led electric power enterprises very difficult to do integrated resources planning(IRP) because generation, transmission and distribution were to be unbundled.
电力市场化改革打破了电力企业发输配售垄断的生产经营模式,也失去了电力企业制订综合资源规划的条件。
3) integrated resource planning
综合资源规划
1.
According to the principle of integrated resource planning (IRP), describes the know-how in CEP, such as target setting, estimation of available resources, load forecasting, scheme of energy system, determination of virtual power station, implementing stricter energy efficiency standard, and full process management etc.
根据综合资源规划的原理,提出在区域建筑能源规划中的几项关键技术,如节能目标的设定、可利用资源量的估计、负荷预测、能源系统配置、虚拟电厂的确定、实行更高的建筑节能标准,以及全程管理等。
2.
If the integrated resource planning has the resources of the supply-side and demand-side in the planning process considered at the same time, it can realize the objective of minimizing the total cost.
综合资源规划在电力规划中将需求侧资源与供应侧资源同时考虑,能够实现规划的总成本最小。
3.
However, DC could not be used in integrated resource planning, since system electrical demand is divided into several classes due to different reliability require-ments.
但该方法不能解决综合资源规划面临的新问题,因为其中的系统负荷被划分为若干部分,每个部分具有不同的可靠性要求;类似的情况也存在于电力市场环境中。
4) water resources comprehensive plan
水资源综合规划
1.
Flood control checking of urban water resources comprehensive plan in plain river network;
平原河网城市水资源综合规划防洪校核研究
5) integrated resource planning(IRP)
综合资源规划
1.
Based on the integrated resource planning(IRP) for cross-regional transmission,the issue was studied on how to involve emission-reduction costs into IRP in order to encourage low-emission generation units to more actively participate into power planning.
在考虑跨区省输电的综合资源规划方法的基础上,研究如何在规划中考虑减排成本,促进排放率低的发电资源更多地参与规划。
2.
Based on the current situation of electric power planning and generation and transmission resources in China,a new integrated resource planning(IRP)method,which takes the inter-regional transmission into account,was proposed.
结合我国的电力规划以及发电、输电资源的现状,提出了考虑跨区省输电的综合资源规划,首先描述了需求侧资源、供应侧资源以及跨区省输电资源的概况,其次以综合能源成本为准则,对省区内外的各种资源进行筛选,得出总成本最小的电力资源组合,最后以我国某省的实际数据验证了该模型的实用性。
补充资料:城市总体规划与国土规划、区域规划的关系
国土规划、区域规划、城市总体规划是在不同层次、涉及不同地域范围的发展规划。国土规划、区域规划、城市总体规划组成一个完整的规划系列,国土规划和区域规划应当是城市总体规划的重要依据。而全国和区域性的江河流域、土地利用等专业规划则是国土和区域规划的重要组成部分,城市土地利用规划又是城市总体规划的重要组成部分。
我国的国土规划、区域规划以及江河流域规划、区域性土地利用总体规划等工作起步较晚,目前正在有计划、有重点地逐步展开,还没有法定的审批程序和审批成果。而全国绝大多数城市总体规划已经各级政府按法定程序审批,并在不断完善和深化,在实际工作中存在着相互联系和交叉的情况,因此本法原则确定应当相互协调的关系是必要的。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条