1) MTR Corporation
港铁
1.
Operating experience discussions of urban rail transit projects of MTR Corporation
对港铁城轨项目成功运作经验的探讨
2) Tieshangang bay
铁山港湾
1.
Development Trend of the Water Quality Conditions in the Tieshangang Bay;
铁山港湾水质状况发展趋势
2.
After analyzing the hydrodynamic condition and the variations of the water environment factors over the past 20 years(1983-2003) of Tieshangang bay,we tried to find out the relationship between the self-purifying ability and the environment factors of Tieshangang Bay.
通过对铁山港湾水动力条件及20a(1983~2003年)来水环境因子变化状况的分析,探讨了该湾水体自净能力及其与环境因子之间的关系,结果表明:该湾具有较强的水体自净能力,但其物理净化能力是以潮流的水动力作用影响为主,迳流影响较小,与北海湾和钦州湾有明显差别;其化学净化能力主要体现在溶解氧的含量水平、有机污染物的氧化分解能力、营养盐的形态转化及消减程度上;其生物净化能力则体现在微生物及浮游动植物对有机物的直接降解及间接贡献上,具有贫营养区的水体自净特点。
3) Gangli Iron Mine
港里铁矿
1.
Control of the Stability of Drift of Non-pillar Sublevel Stoping in Gangli Iron Mine;
港里铁矿无底柱分段崩落采矿中巷道稳定性控制
4) Tieshan harbor
铁山港
1.
Rural human drinking water work construction of Tieshan harbor district;
铁山港区农村人饮解困工程建设实践
2.
Submarine Dynamic Geomorphological Characteristics and Their Formation Cause in the Tieshan Harbor Area;
铁山港湾水下动力地貌特征及其成因
5) Hong kong metro
香港地铁
1.
Management Mode and Experience of Hong Kong Metro Projects;
香港地铁工程项目的管理模式和经验
2.
This paper introduces in detail the treatment procedures in dealing with emergencies in the Jinzhong metro station, including station on fire, explosion threat, passengers getting on and off train in the section and electricity malfunction of 33kV/11kV after analyzing the treatment of an arson affair in a Hong Kong metro train.
通过对香港地铁一起列车纵火事件的处理和分析,详细介绍香港地铁金钟车站对车站着火、爆炸恐吓、列车从路轨上下客、33kV/11kV电压全部故障等突发事件的处理程序。
6) Hong Kong West Railway
香港西铁
1.
Construction technology of floating slab track for Hong Kong West Railway;
香港西铁浮置板轨道施工技术
2.
Construction and quality control of bored pile for Hong Kong West Railway;
香港西铁工程钻孔桩施工与质量控制
补充资料:港湾
便于船只停泊的海湾,一般有防风、防浪设备。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条