1) Dagang hydropower station
大港水电站
1.
The failure analysis and treatment of Dagang hydropower station's programmable logic controller speed controller
大港水电站可编程控制器调速器故障分析及处理
2) Guigang hydropower station
贵港水电站
3) Dahua Hydropower Station
大华水电站
1.
Evaluation on stability analysis of penstock of Dahua Hydropower Station;
大华水电站钢管道稳定分析评价
5) hydropower dam
水电站大坝
1.
At present, major problems commonly exist in safety monitoring for hydropower dams.
目前水电站大坝安全监测工作中 ,存在着观测设施陈旧 ,自动化程度不高 ,观测资料分析深度、广度缺乏全面性和系统性 ,设计市场混乱 ,施工单位在首次蓄水期间未能及时建立监测设施 ,运行管理单位监测队伍不稳定等现象。
6) Dahua hydropower station
大化水电站
1.
Summary on dam safety operation management for Dahua Hydropower Station;
大化水电站大坝安全运行管理综述
2.
Review on Hydraulic Characteristic Curve of Dahua Hydropower Station
大化水电站水务特性曲线复核
3.
Temperature monitoring system on overflow sections in Dahua hydropower station is introduced,along with analysis on long monitoring data,from which the law of temperature distribution and its change in solid dam section,hollow dam section and piers are presented.
本文介绍了大化水电站溢流坝温度监测系统,并对长期监测资料进行了分析,找出了空腹坝段、实体坝段及闸墩温度分布规律及变化规律,通过与设计计算温度场对比,找出了引起两者差异的原因。
补充资料:冰港水电站
冰港水电站 |
Ice Harbor HydropowerStation |
概 述 |
冰港水电站是哥伦比亚河支流斯内克河上兴建的最下一级水电站,在下纪念碑水电站以下约50km处,离斯内克河流入哥伦比亚河的入汇口帕斯科镇不到30km。最大坝高63m;坝址处多年平均流量1350m3/s,水库正常蓄水位134m,总库容5.01亿m3,有效库容0.3亿m3;水电站发电水头30m,总装机容量60.3万kW,年均发电量27.2亿kW·h。工程以发电为主,兼有航运等综合效益。所建船闸为单级船闸,长205.5m、宽26.2m,槛上水深4.57m,提升高度31.4m,年通过能力310万t(1986年)。工程于1961年开始投产发电。 |