1) flood risk rate
行洪风险率
2) flood prevention risk ratio
防洪风险率
1.
According to the lgic process of overtopping of flood defense projects a quantitative calculation method for flood prevention risk ratio is proposed and an empirical equation for predicting loss of lives is deduced.
按照防洪工程漫顶失事的逻辑过程提出了防洪风险率的定量计算方法,引入了人员伤亡预测的经验公式,讨论了制定允许风险标准问题。
3) flood hazard risk rate
洪灾风险率
1.
Based on flood risk analysis,the paper applies probability combination method to estimateflood hazard risk rate of flood control region in reservoir downstream regarding law of floodencountering combination as the object of study.
在洪水风险分析的基础上,以洪水遭遇组合规律为分析对象,运用概率组合方法估算了水库下游防洪区的洪灾风险率,以判断当地防洪措施的实际防洪能力,为水库防洪调度方案的制定提供科学依据。
4) maximum flood hazard risk rate
最大洪灾风险率
1.
Taking Three Gorge reservoir as a case study, according to operation rule, we can effectively acquire the relationship between different flood season limit levels and maximum flood hazard risk rates.
并以三峡水库为研究对象,根据调度运行原则,计算出了不同汛限水位与最大洪灾风险率的关系,供决策者进行权衡比较,帮助决策者在认真分析比较的基础上作出符合科学原则的风险决策。
5) flood risk
洪灾风险
1.
Flood risk assessment is the first step in the flood risk management.
洪灾风险评价是洪灾风险管理的首要步骤。
2.
Secondly,discount rate was applied to the quantitative format of flood risk.
洪灾风险分析是实施洪水预报预警、洪水保险等非工程措施的前提,对防洪减灾有着重要意义。
6) Flood risk
洪水风险
1.
Comparative study on flood risk analysis in Netherlands and China;
中国与荷兰洪水风险分析方法的比较研究
2.
Research on regional assessment of flood risk and regionalization mapping in China;
全国区域洪水风险评价与区划图绘制研究
3.
Qualitative analysis of flood risk drivers and responses in Taihu Basin
太湖流域洪水风险动因和响应的定性分析
补充资料:行洪
行洪
【行洪】减免洪水泛滥的一项措施。在特大洪水时,临时放弃干堤间阻碍水流的抒岸,扩大河道的过水断面,使洪水安全下泄。行洪地区平时可以照常耕种。行洪保险是当洪水来临,政府或水利部门考虑到洪水可能造成国家财物的更大损失,而下令采取行洪措施,以保障更大的国家利益。这种行洪损失,保险公司通过办理行洪保险负赔偿责任。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条