1) foundation treatment CFG pile and plastics drainage plate
CFG桩和塑料排水板地基处理
2) CFG pile-slab composite foundation
CFG桩桩板复合地基
1.
Based on typical volume element and 3D FEM model established,this paper is intended to analyze the post-construction settlement of high-speed railway CFG pile-slab composite foundation and its affecting parameters by means of numerical simulation.
基于典型段体积元,建立三维有限元模型,通过数值模拟计算分析高速铁路CFG桩桩板复合地基工后沉降(简称"工后沉降")及其影响参数。
3) Sand(plastic)-drained ground
砂井(塑料排水板)地基
4) plastics board pile processing
塑板桩处理
5) processing method of overload and prepressed using plastic drainage plate
塑料排水板超载预压处理
6) prefabricated drains
塑料排水板
1.
For soft clayey foundations consolidated with the prefabricated drains method,coefficiency of consolidation,separation and depth of the prefabricated drains and the effects of well resistance and smear,etc.
对塑料排水板法加固软粘土地基而言,塑料排水板的固结系数、排水板的间距、处理深度极其井阻与涂抹作用等都直接影响着加固效果。
2.
The treatment and effectiveness by use of prefabricated drains method to dissipate the excess pore pressure by pile driving are also introduced under the condition without external loads.
在不加外荷载情况下,采用塑料排水板方法消散打桩引起的超静孔隙水压力的处理措施,解决了高孔隙水压力下主厂房的开挖问题。
补充资料:[3-(aminosulfonyl)-4-chloro-N-(2.3-dihydro-2-methyl-1H-indol-1-yl)benzamide]
分子式:C16H16ClN3O3S
分子量:365.5
CAS号:26807-65-8
性质:暂无
制备方法:暂无
用途:用于轻、中度原发性高血压。
分子量:365.5
CAS号:26807-65-8
性质:暂无
制备方法:暂无
用途:用于轻、中度原发性高血压。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条