1) length of prestress pipe pile
预应力管桩长度
2) super-long pre-stressed tubular pile
超长预应力管桩
1.
The paper introduced an engineering case of super-long pre-stressed tubular pile in silty and sandy soil with the longest design pile length of 60m,diameter of 550mm and 600mm,connected by 4 piles of 15m,the length-diameter ratio was more than 100.
伊萨卡管桩工程最长的设计桩长60 m,桩径为550及600 mm,采用4节15 m的桩连接,长径比超过100,属于超长预应力管桩且地基土层主要为粉土与砂土。
3) prestressed pipe pile
预应力管桩
1.
The application of prestressed pipe pile in soft soil foundation works of special railway line project for passenger transportation along the coastal areas;
预应力管桩在沿海客运专线软基施工中的探讨
2.
Study on the prestressed pipe pile-net composition foundation in prevention bumping of vehicle at bridge head;
预应力管桩—网复合地基防止桥头跳车的研究
3.
The application of prestressed pipe piles in the improvement of soft foundation in highway engineering;
预应力管桩在公路软基处理中的应用
4) prestressed concrete pipe pile
预应力管桩
1.
Application of prestressed concrete pipe pile in deep foundation pit;
预应力管桩在深基坑支护工程的应用
2.
Prevention of common quality defects of prestressed concrete pipe pile;
论预应力管桩施工中的质量通病防治
3.
The construction technology and technological requirements of prestressed concrete pipe piles in expressway bridge are introduced.
本文介绍了预应力管桩在高速公路桥梁工程中的施工工艺,通过对现场实测资料的研究,分析了压桩力与地层地质的关系及与CPT、CPTU测试数据的对比结果,探讨了超孔隙水压力的大小、分布、变化规律及影响范围。
5) pre-stressed pipe pile
预应力管桩
1.
Common problem in static-pressure pre-stressed pipe pile construction and its prevention measure;
静压预应力管桩施工中常见的问题及预防措施
2.
The damage of pre-stressed pipe pile was treated by concrete core grouting of cast-in-place pile with casing underwater cement grouting technology and grouting reinforcement for fracture surface with post grouting in field cases,comparison was made on test results around the construction operation.
通过工程实例,介绍了预应力管桩受损后采用套管法水下砼灌注工艺灌注桩心砼结合后压浆工艺对管桩断裂面注浆加固的工艺方法,并对实际施工前后的检测结果进行了对比。
3.
Pre-stressed pipe pile foundation is used in the gymnasium of certain primary school, in which some pile-heads of them are deviated during the course of constructing.
通过对某小学活动馆的预应力管桩基础在施工过程中出现的桩头偏位的情况进行分析与处理,取得了较好的实用效果并得到了一些有益的经验。
6) pre-stressed tubular pile
预应力管桩
1.
The construction of static pre-stressed tubular pile in a certain high-rise building engineering;
某高层住宅工程静压预应力管桩的施工
2.
Analysis of the causes of crack in the crown of pre-stressed tubular pile and its prevention;
预应力管桩桩头爆裂原因分析及预防
3.
Prevention and cure of static pressure pre-stressed tubular pile s squeezing effect in soft foundation;
软土地基静压预应力管桩挤土效应的防治
补充资料:预应力
分子式:
CAS号:
性质:试验中试样所受到的预加的恒定静态应力,单位为Pa。在生热性疲劳试验中,如固特里奇屈挠试验中,一般都施加一恒定预应力,使试样产生一静态变形,再叠加一周期压缩变形进行试验,通常预应力的大小会影响试样的疲劳寿命,预应力越大,则试样寿命会越明显缩短。也有的先施加一静态压缩变形,再叠加周期性剪切变形进行试验。
CAS号:
性质:试验中试样所受到的预加的恒定静态应力,单位为Pa。在生热性疲劳试验中,如固特里奇屈挠试验中,一般都施加一恒定预应力,使试样产生一静态变形,再叠加一周期压缩变形进行试验,通常预应力的大小会影响试样的疲劳寿命,预应力越大,则试样寿命会越明显缩短。也有的先施加一静态压缩变形,再叠加周期性剪切变形进行试验。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条