1) Shenyang-Dalian highway
沈大高速
1.
The horizontal directional drilling technology and its application to the project of natural gas pipeline crossing Shenyang-Dalian highway are introduced,and the technical requirement for construction, preliminary preparation before construction,construction methods and project quality assurance measures are discussed.
介绍了水平定向钻技术及在天然气管道穿越沈大高速公路工程中的应用,探讨了施工技术要求、施工前期准备、施工方法及工程质量保证措施。
2) Shen-Da Expressway
沈大高速公路
1.
Pavement Performance Evaluation and Analysis of SMA16L Mixture Used in Shen-Da Expressway;
沈大高速公路SMA16L混合料路用性能评价与分析
2.
Feasible Analysis of Pavement Retexture in Shen-Da Expressway;
沈大高速公路路面再生可行性分析
4) Shenyang-Dalian expressway
沈大高速公路两侧
1.
Distribution characteristics of soil heavy metal pollution at both sides of the roads along Shenyang-Dalian expressway;
沈大高速公路两侧土壤重金属污染分布特征研究
6) Shenyang Dalian high speed passageway
沈大快速通道
1.
Based on the substantive analysis about the positive and negative effect of the spacial structure of Shenyang Dalian high speed passageway,the basic countermeasures for adjustment are proposed.
对沈大快速通道的空间结构正负效应作了实证分析 ,并提出基本的调控措施 。
补充资料:沈大高速公路
沈大高速公路 中国辽宁省内自沈阳至大连的高速公路。途经辽阳、鞍山、营口,全长375千米。中国最长的高速公路(截至1993年5月1日)。1984年6月动工,由南北两端向中间推进施工,1990年8月20日建成通车。全部工程由中国自行设计、施工。路基宽26米,分上下行4个车道,中间分隔带宽3米,两侧设紧急停车带。全部为沥青混凝土路面。全部控制出入口,采用立体交叉。设计车速在山岭地区为100千米/小时,其他地段为120 千米/小时。沿线修建跨海湾特大桥普兰店湾大桥,桥长1206米;桥长在100米以上的大桥15座;中、小桥384座,互通式立交桥26座。沿线设微波通信站13处,服务区、停车场各6处,管理所7处。在沈大高速公路上,还通过加宽两侧土肩,建成一条长2800米、宽50米的军用飞机跑道。沈大高速公路纵贯辽东半岛,使这一工业走廊联成为一个整体,并沟通了大连港、营口港、鲅鱼圈港与东北三省及内蒙古东部广大腹地的联系。沈大高速公路是东北地区一条重要的运输大动脉,是保障国防的大通道。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条