2) large concrete pier cap
大体积混凝土承台
1.
The prevention and cure of temperature cracks in large concrete pier cap is a serious difficulty in quality controlling of construction.
温度裂缝防治是大体积混凝土承台施工质量控制的一大难题。
3) cushion caps concrete
大承台混凝土
1.
Construction technology of the core tube cushion caps concrete of the modern business building;
现代商务大厦核心筒大承台混凝土施工技术
4) mass concrete
大体积混凝土
1.
Dynamic analysis on temperature field in mass concrete of high performance and study of mathematical model;
高性能大体积混凝土逐时温度场有限元动态分析
2.
Study on the causes of cracks in mass concrete and crack-resistance measures;
大体积混凝土裂缝产生原因及防裂措施综述
3.
Calculation and study of the temperature field of the cooling pipe cooling of the mass concrete;
大体积混凝土冷却水管降温温度场的计算研究
5) large volume concrete
大体积混凝土
1.
The reason and precautionary measures about the large volume concrete crack produces;
大体积混凝土裂缝产生的原因及预防措施
2.
The design of 2.5 m large volume concrete formwork support in some medical technology building;
某医技楼2.5m厚大体积混凝土模板支撑设计
3.
Research on hydration heat coefficient of large volume concrete for high building foundation;
高层建筑基础大体积混凝土水化热系数研究
6) bulky concrete
大体积混凝土
1.
Discussion of temperature monitoring and control of bulky concrete;
大体积混凝土温度监测和控制的探讨
2.
The application of temperatare control technique to bulky concrete;
温度监控技术在大体积混凝土的应用
补充资料:柱,锥,台体体积公式
v台体=1/3h(s上+√(s下*s上)+s下)
当s上=s下时:
v柱=s*h
当s上=0时:
v锥=1/3s*h
都可根据台体体积推得."s上"为台体上体面,"s下"为台体下底面,"h"为高.
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条