1) central Sichuan Basin
四川盆地中部
1.
It is proposed that the method of continuous and intensive water withdrawal for some wells of water production in the Upper Triassic,central Sichuan Basin would increase different pressure between the well bottom and the gas above the water body,and accomplish quickly the goal of changing water production to gas-water co-production.
四川盆地中部上三叠统砂岩储层裂缝系统之间在开发动态上表现出相互分隔性,不存在连通范围较大的边底水体,其自生自储的成藏特征决定了裂缝系统中必然气水共存。
4) southwest Sichuan Basin
四川盆地西南部
5) northwestern Sichuan Basin
四川盆地西北部
1.
Study on reservoir of the Leikoupo Formation of Middle Triassic in northwestern Sichuan Basin;
四川盆地西北部中三叠统雷口坡组储层研究
2.
Sedimentary facies and palaeogeography of northwestern Sichuan Basin during the Leikoupoan(Middle Triassic);
四川盆地西北部中三叠世雷口坡期岩相古地理
6) eastern Sichuan basin
四川盆地东部
1.
Sequence stratigraphy and coal accumulation of the Upper Triassic Xujiahe Formation in eastern Sichuan Basin
四川盆地东部上三叠统须家河组层序地层及聚煤特征研究
2.
The formation process and charging history of the Carboniferous gas pools in eastern Sichuan basin are reconstructed through the study of hydrocarbon fluid inclusions from the secondary calcite vein in carbonate reservoirs.
应用碳酸盐岩储层次生方解石脉中的烃类流体包裹体研究方法,对四川盆地东部石炭系气藏的形成及充注史进行了恢复研究。
补充资料:四川游泳馆
座落在成都市南郊,1980年12月建成。它是目前中国设备较为先进,能较好地满足游泳、水球、跳水训练和比赛用的一座综合游泳馆。该馆为矩形平面,占地面积 17098平方米,建筑面积12132平方米,长115.5米,宽48.6米,高22米。在观众席的布局上,改变了中国传统的对称式,在北端设单面观众席及贵宾席共1800座。南端为开敞式运动员准备间及观摩席 400余座,在必要时还可设置1000席活动座椅。东西端为采暖、通风系统的机房和办公室。北端底层为水处理和电声系统的设备用房。池厅长99米,宽39米,高18.8米。设有 8条泳道的游泳池和跳水池。跳台有10米、 7.5米、5米(2台)、3 米、1.5米和1米台,另有3米、1米跳板各两块。跳水池有压缩空气制浪装置。馆内设计水温25℃、室温27℃,并可根据比赛需要进行调整,相对湿度60%~70%。水处理采用池水循环过滤并加热消毒的方法。使用单侧上送下回式通风和集中式采暖系统。该馆在音响、照明等方面可满足现场电视实况转播的需要。为配合国际、国内大型比赛,馆内还设有电子计时记分器。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条