说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 规划优化
1)  planning optimization
规划优化
1.
The authors have put forword an idea of that the planning optimization scheme on elevation control of drainage pipelines in coastal plain,such as plastic sewers & core mould vibration-reinforced concrete rain-water pipes are applied,and sometimes a steel short pipe coated by special painting instead of sewer directly passes through a rectangular rain-water inspection well,etc.
提出了沿海平原排水管道高程控制规划优化方案,诸如采用塑料污水管和芯模振动钢筋混凝土雨水管,有时利用涂特种漆钢短管代替塑料污水管直接穿越一座矩形雨水检查井等,其内容可供同行参考。
2)  optimal planning
优化规划
1.
Improved genetic algorithm of mid-voltage distribution network optimal planning;
中压配电网优化规划的改进遗传算法
2.
Optimal Planning of Distribution Network Modele Connection;
配电网模式化接线优化规划
3.
This paper points out with an example the importance and complexity of constructing or retrofitting a steam supply and district heating system in petrochemical industry according to optimization principle A method and tool to carry out the optimal planning of the system is presented.
介绍了一种实现此类系统优化规划的方法和工具。
3)  optimized planning
优化规划
1.
Method for optimized planning of county-level mid-voltage distribution network frame based on GIS technology;
基于GIS技术的县级中压配电网架优化规划方法
2.
The paper probes to the conception of comprehensive pollution control of rivers, optimized planning model and programming.
本文探讨了河流污染综合治理的概念,优化规划模型和程序,介绍了“节点开放试探法”的求解技术,并以四川省鉴溪河流综合治理为例,应用上述优化规划方法和求解技术。
4)  optimization planning
优化规划
1.
Substation optimization planning plays an important role in urban network planning.
针对变电站优化规划这一城市电网规划工作中的重要环节,提出了一种基于加权Voronoi图的变电站规划方法,可以最终完成对变电站数量、容量、站址及供电范围的优化。
2.
This paper proposes a practical two-phase approach to substation optimization planning.
提出了一种变电站两阶段优化规划方法。
5)  optimum planning
优化规划
1.
In this paper, a large scale distribution system optimum planning is formulatedas a mixed integer programming problem.
为了实现大规模配电网的优化规划,以配电网扩建投资总额为目标函数,建立了混合整数规划模型,满足配电网的电流和电压方程、线路和变电所的容量约束及电压要求。
6)  planning and optimization
规划与优化
1.
After doing researches on network planning and optimization, our project team has developed a project-oriented transmission network planning and optimization software system ( Unitrans ZXTOP 500).
因此,要实现向下一代光网络平滑过渡,就必须对现有传输网络进行规划与优化,以提高网络效率和减少运营成本。
补充资料:规划
①比较全面的长远的发展计划:制订~丨十年~。②做规划:兴修水利问题,应当全面~。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条