1) backorder rate
延期交货率
2) delivery delaying
延期交货
1.
The new targets and the rule of operation sequence for the job and small batch production are proposed, they include the least expense in delivery delaying and the smallest cost in work_in_process occupying.
本文分析了非流水型作业排序的特点,提出在单件小批生产条件下,以最小延期交货损失费、最小在制品占用成本和最大设备利用率为排序目标,采用新的优化规则及算法求近优排序结果。
2.
Quality cost and delivery delaying cost are important factors of supply chain contracts.
质量成本和延期交货成本是供应链企业签订契约时需要重点考虑的问题。
3) backlogging
延期交货
1.
This paper addresses a dynamic single-item lot sizing problem with backlogging and outsourcing and non-decreasing inwentory capacity.
研究了一个非减库存能力约束下的允许延期交货和转包的单产品动态批量问题。
2.
Then, we addressed the case of considering backlogging, and designed a GA-based algorithm.
本文研究了考虑再制造的多级受限批量问题,主要内容有:概述了生产计划和逆向物流的相关概念;综述了多级批量问题和再制造方面的研究进展;简介了遗传算法的基本理论和应用领域;建立了混合制造/再制造的多级批量模型,构造了基于搜索过程的可行状况和约束违背程度的自适应罚函数,把有能力约束的批量问题转换成无能力约束的批量问题,并采用遗传算法(GA)求解该模型;将问题扩展到允许延期交货情况,设计了基于GA的求解算法;针对两类问题模型,分别设计了串型和一般型产品结构的算例,验证了提出算法的有效性。
4) delay the delivery
延期交货,延期交船
5) spread delivery
分期交货;延期交货
6) the Coefficient of Back-orders
延期交货系数
补充资料:延期
1.延长或推迟时日。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条