1) frontal pressure
正面压力
1.
This paper describes the acquisition of various parameters in relation to frontal pressure,relationship between them and analysis or refinement of them by means of data acquisition of daily advance process performed by an upperbound shield for Changjiang Tunnel in Shanghai.
本文介绍了通过对长江隧道上行线泥水平衡盾构每天推进过程的数据收集,获得与正面压力相关的各种参数及参数之间的关系,并进行分析整理。
2) fault plane normal pressure
断面正压力
1.
The lateral seal and vertical seal mechanism of fault and effecting factor are analyzed, the result shows that the evaluation method of fault lateral seal is Allan that is the base, using shale content calculation result to forecast fault rock type, the evaluation method of fault vertical seal is to calculate fault plane normal pressure and analyze fracture seal.
综合分析断层侧向和垂向封闭机理,确定断层侧向封闭性评价方法为以Allan图为基础,以断裂带中泥质含量计算结果去预测断层岩类型;断层垂向封闭性评价方法为计算断面正压力及分析裂缝的评价方法。
3) ormal pressure of fault surface
断层面正压力
1.
Analysis on fault s vertical sealing and its evolution by normal pressure of fault surface method in the Weixinan Sag,Beibu Gulf Basin;
用断层面正压力法分析北部湾盆地涠西南凹陷断层垂向封闭性及其演化
5) earth balance pressure
正面土压
6) tick-mark nearside
正面压印
补充资料:断面
1.剖面﹐物体切断后呈现出的截面。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条