1) pre-research project of space background model
背景型号预研项目
1.
This paper summarizes the researches of the risk management of the domestic and international projects, makes systematic analysis of the risk in the pre-research project of space background model applying the theories and methods of the risk management.
本文总结了国内外项目风险管理的研究进展,以XX航天项目为背景,利用风险管理的理论方法对航天背景型号预研项目风险进行了全面系统的分析。
4) beforehand research project
预研项目
1.
In this paper, the genetic algorithm and BP algorithm are hybridized to form a new method for termination decision of beforehand research projects.
预研项目的中止决策是我国军队预研管理工作中的薄弱环节。
5) model project
型号项目
1.
System planning and reengineering of model project development;
型号项目研制过程系统规划及重组
2.
According to the characteristics of the process of the model project,the risk management decision model of the model project is presented.
针对型号项目的过程特点,建立了型号项目工期风险的管理决策模型。
6) Airplane model development project
飞机型号研制项目
补充资料:项目背景及一般情况
项目背景及一般情况
卷八衍生品交易527参加。燃料费及营运费拨给中方,承包经营运一步改变了同外方的合作方式。从设备采购、行在利润分配方面,双方不承担对方所得人施工总承包合同谈判到融资谈判均由中外双方民币和美元的汇率风险。共同参加c.电厂的土建和安装包给国内施工单 咫电厂运行由中方总承包,不但节省了位,节省了外汇支出。运行的外汇支出,中方人员还有机会掌握运行下表是凡电厂(3只70万kw)与竹电技术电厂’土建工程由外方总承包,安装分包厂(2x70万kw)投资费用的比较。可以看给设备供应商。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条