说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 框架语义结构
1)  frame-semantic construction
框架语义结构
1.
Chapter five describes and analyzes the frame-semantic constructions in the Domain of Causat
对现代汉语的致使类词元进行系统的考察,建立致使类词元库;构拟语义框架式;对致使类核心框架元素和非核心框架元素及其句法实现进行研究,系统描写分析汉语致使类框架语义结构,为标注例句和建立致使类例句库提供理论基础。
2)  semantic frame structure
语义框架结构
3)  frame semantic
框架语义
1.
Free text information extraction based on frame semantic tagging;
基于框架语义标注的自由文本信息抽取研究
2.
Research on Chinese Phrases Automatic Recognition Based on Frame Semantics;
面向框架语义的汉语短语自动识别研究
3.
The paper gives an introduction to Chinese knowledge representation using frame semantic on the ontological view, which is being carried out in the Chinese FrameNet Project.
本文研究一种基于框架语义的汉语文本知识表示方法,该方法正在汉语框架网络工程(CFN)中实施应用。
4)  semantic framework
语义框架
1.
According to the semantic representing system-semantic framework,a semantic-isomorphism-based semantic distance algorithm is proposed.
针对句子语义知识的表达方式、语义框架,提出一种基于语义同构的语义距离算法,通过计算代表句子语义的两个语义框架的最大同构子框架和最大包容子框架,计算句子的语义距离,并且通过动态调整句子成分的权重,提高算法的有效性。
2.
This paper defines a group of binary relations of goals similar to Tropos to extend semantic framework of KAOS models, which makes the positive and negative effects of goals explicit in the models.
该文定义一组类似于Tropos中目标间的二元关系,扩展KAOS的目标模型语义框架,使目标间的支撑和抑制作用明朗化。
3.
The matching of semantic framework based on the matching technology of keywords ensures the speed of information filtering,and improves the precision of information filtering.
为进一步提高过滤效率,该文提出一种基于内容的混合模式过滤模型,引入语义分析技术,在关键词匹配技术的基础上进行语义框架的匹配,从而保证信息过滤的速度,改善信息过滤的准确度。
5)  Frame Semantics
框架语义
1.
The Chinese FrameNet project is producing a lexicon of Chinese for both human use and NLP applications,based on the principles of Fillmore s Frame Semantics.
汉语框架网络工程是以框架语义学为理论基础的基于语料库的计算词典编纂工程,用于语言学、计算语言学研究及自然语言处理研究。
2.
CFN is a research project which is creating a computational lexicon for Chinese, based on Frame Semantics, referring to the Berkeley FrameNet and supported by corpus evidence.
本文介绍汉语框架语义知识库(Chinese FrameNet,简称CFN)的语义知识描述方法。
6)  semantic frame
语义框架
1.
This paper gives a model of situation semantic frame - key technology in our system, which can deal with the difficulty of spoken language understanding system.
文中定义了一个情景语义框架模型 ,较好地处理了口语理解系统的一些难
2.
Conceptual metonymy exists not only in a typical frame,but also in relevant with two or different semantic frames with various modes mapping in the .
语义框架是概念转喻映现的认知基础,概念转喻的映现不仅存在于同一类典型框架内,而且与两个或多个不同的语义框架有关,并在语义框架内有多种映现模式。
3.
Second, based on the semantic frames and their relation with argument structures of clauses, within the perspective of the operational properties of the linguistic system, it proposes the conceptual frames with operational plausibility.
二、基于词汇语义框架及其和小句论元结构的关系,从语言系统可操作性的角度出发,提出可实施认知操作的小句概念框架。
补充资料:多层厂房预制钢筋混凝土框架结构安装


多层厂房预制钢筋混凝土框架结构安装
installation of precast reinforced concrete frame structure for multilayer workshop building

定.11 ~.。」:柱1一可下门- 杯形井礴11铆椒,甲丫一目一一丫 位板沙父父护科月黔今了牛’J一一确r一一土- 二黑交哪嗯浮i钊粼减图“连接板埋设件连接法 图1柱子固定示意图柱子四面的连接板和埋设件,然后进行连接板外表面 的刷油和涂装。 由于混凝土的抗弯性能所限,混凝土柱不能过长。梁和板的安装在第一节柱安装完成后,及时将对较高的多层框架柱,一般都设计成多段,在预制厂分预制梁、板安装好,以尽快形成整体框架,保持结构的节制作,运至现场后,由安装者在高空对接成整根柱。稳定。梁与柱的连接多采用柱肩梁承接式,通过梁端头这种多节柱安装的关键在于柱与柱之间对接接口的施上下两面的埋设件与柱的埋设件焊接、固定(图4)。梁工,常用的接口型式有湿式连接(图2)和连接板埋设固定后,将预应力钢筋混凝土板座落在梁上,通过将大件连接(图3)两种。(1)湿式连接法。起吊前先实地板两端下边的埋设件与梁上面的埋设件焊接在一起,量测预留钢筋接头的尺寸,将接头调直,开好坡口;将将板固定起来(图5),使框架形成一个空间刚体。如接头处的混凝土面打毛处理,在柱头上事先系3一4根此逐层依次施工,直至完成多层厂房框架结构的全部缆绳,用于调整柱子就位后的垂直度。起吊后将上下柱安装工作的钢筋接头对准,并用两台经纬仪同时测量柱子相邻丁粉可-两面的垂直度,用缆绳进行校正。垂直度合格后进行对!」下称焊接,先焊接头支承面的钢板埋设件,再焊柱子四角!华卜一,一一洲二二的钢筋和全部对接钢筋,然后复核上下柱中心的垂直1七口,杏一一.州.去盛,度,若无偏差立即支模灌浆。(2)连接板埋设件连接法。IJ}}将柱子起吊后与下柱对准就位,并用两台经纬仪同时!//~测童校正相邻两面的中心线垂直度,合格后进行焊接。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条