说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 隧道弃渣
1)  mucking debris from tunnels
隧道弃渣
1.
This paper is based on the Highway of Rui Gan, we select some typical Sections,carried on the scene detection of PFWD for the red sandstone,gravel soil and mucking debris from tunnels,Co
本文以瑞赣高速公路为依托,选取了一些典型地段,针对红砂岩、碎石土和隧道弃渣三种特殊土路基进行了PFWD现场检测,并与传统的现场承载板和贝克曼梁检测方法对比,进行了相应指标的相关性分析,得到了不同指标之间的换算关系。
2)  tunnel cinder
隧道渣
1.
Take tunnel cinder subbase construction of a motor-only 2nd grade highway as an illustration,which is also an external traffic lane leading to Xiluodu hydroelectric station,this paper details tunnel cinder subbase construction by 5 aspects:compare & choice of tunnel cinder and graded gravel subbase,construction methods,construction process,construction quality control,construction key attention.
以溪洛渡水电站对外交通汽车专用二级公路隧道渣底基层施工为例,分别从隧道渣和级配碎石底基层对比及选择、施工工艺、施工步骤、施工中注意事项、施工质量控制重点这5方面分析了隧道渣底基层施工。
3)  waste soil and residue
弃土弃渣
1.
With large quantity of waste soil and residue piled up in the course of river and ditch way, water and soil loss both remarkably rose.
大量弃土弃渣堆积于河道与沟道 ,加剧了水土流失 ;大柳塔等矿发生 8hm2 的塌陷与地裂缝 ,引起地下水渗漏 ,水位下降 2~ 3m ,甚至断流 ;大量植物死亡 ,土地沙化日趋严重 ;人为滑坡、泥石流活动频繁 ;河道泥沙变粗近 5倍 ,粗沙比例增加 ,淤积使过水断面减少了 37。
2.
<Abstrcat>The authors summarized the reason of waste caused by highway construction in Jiangxi Province and analyzed waste soil and residue prevention and control technologies which composed by field choice of waste soil and residue,drainage engineering, slope protection engineering and vegetation rehabilitation.
总结了江西省高速公路建设弃土弃渣产生的原因,分析探讨了由弃土弃渣场地的选择、排水工程、边坡防护工程和植被恢复工程为核心的弃土弃渣防治技术,并对高速公路弃土弃渣的预防监督工作提出了建议,以资同行商榷。
4)  debris of construction
弃渣弃土
5)  metallurgical waste slag
冶金弃渣
1.
This paper presents the sources,classification,composition and present situation of the metallurgical waste slag.
介绍了冶金弃渣的来源、分类、物质组成以及产出现状,概括了国内外冶金弃渣综合利用方法的新进展,并分析了这些方法的优点与局限,提出了以后的研究方向。
6)  construction spoil
工程弃渣
1.
The article analyzes the construction spoil protection in loess plateau area from the following aspects, such as location selection of the spoil area, design standard of floor, class of structures, foundation works, spoil area improvement, utilization of land as well as investment control.
就黄土高原地区的工程弃渣防护问题 ,从渣场选择、设计洪水标准和建筑物级别、基础工作、渣场改造及土地利用、投资控制等方面进行了讨论 ,强调了渣场位置及其防护方案必须经过综合比较后确定的原则。
补充资料:干渣渣
1.缺乏水分而呈渣屑的样子。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条