1) twin hull sand dredge
双体采砂船
1.
Because of the requirements of suction equipment and working condition, the structural design of twin hull sand dredge is special, the cross-structure can\'t meet the specification requirements, which need to be calculated directly.
本文运用有限元软件ANSYS,以一艘45米的双体采砂船为例进行了直接计算研究。
2) dredge
[英][dredʒ] [美][drɛdʒ]
采砂船
1.
Application of small-sized dredge to the stoping of old tailing of Laozuoshan Gold Mine;
小型采砂船在老柞山金矿老尾矿回采生产中的应用
2.
The hydraulic system is a guarantee for the various functions of a dredge.
采砂船液压系统是采砂船各项功能顺利实现的保证。
3) multi bucket dredger
多斗采砂船
4) Chain bucket dredge
链斗式采砂船
5) Cutter suction dredge
铰吸式采砂船
6) catamaran
[英][,kætəmə'ræn] [美]['kætəmə'ræn]
双体船
1.
Research on resistance of new catamaran and trimaran;
新型双体船和三体船阻力性能研究
2.
Research on numerical prediction method for wavemaking resistance of catamaran/trimaran;
双体船/三体船兴波阻力数值预报方法研究
3.
Experimental and theoretical researches on the rolling motion of the catamaran in gust;
双体船在突风中摇摆运动的试验研究和理论计算
补充资料:采砂船采区解冻
采砂船采区解冻
thawing of dredging area
eo一shoehuon eolqu{ledong采砂船采区解冻(thawing of dredging area) 对季节性冻结的砂矿层融解的L程。解冻方法主要有自然解冻法、分层自然解冻法和水针一解冻法;此外,还有渗流一排水解冻法、人工降雨一排水解冻法、爆破解冻法后三种解冻法均因解冻效果差,生产实际中很少使用。 自然解冻法在一年中的温暖季节(气温在零度以上).利用太阳的辐射能融化冻土层。采用该法时,必须事先清除地表的植物层和剥离表土。一年的解冻深度可达Zm左右。采用该法解冻速度虽慢,但简单而经济,中国东北地区开采砂金矿中应用较普遍 分层自然解冻法利用太阳的辐射能融化冻结上层,每当融化表面一薄层(5一1又m)后,应及时用推土机或铲运机铲除已融化的表面薄层,以使太阳辐射热和热空气继续作用于露出的冻层表面,加速融解速度。一年内融解的总厚度可达8一10m或更大。该法在砂矿开采的剥离工程中广泛应用。 水针解冻法首先在解冻区内按一定网度将一种称为水针的细钢管插人冻土层内,然后用水泵将自然温度(水温高于ZC)的水压人水针,水通过水针上孔向冻土渗流和传递热量,使冻土逐渐解冻。水的压力应能克服管道和冻土孔隙的阻力。开始融化只能是围绕水针很窄的条带,继而逐渐扩大,直到连成一片时拔出水针。水针解冻的效率与水温成正比。水针的作用时间,取决于水温、水针间距、水针插人深度、水钊一流量、土岩含冰量、渗透系数、冻土的初始温度等。该方法的主要优点是解冻费用低、设备简单维修量少,能在短期内融解较深的冻土。其主要缺点是水针插人I_作劳动强度大,特别是在含有巨砾的矿砂中很困难;_工作的季节性强,即水的昼夜平均温度超过1〔时才能开始解冻工作。水针解冻法在开采永久性冻结砂矿中,得到较)一泛应用
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条