1) Process Risk Factor
进度风险因素
2) risk factor
风险因素
1.
Defined risk factors in community health service of Heilongjiang province and discussion on control measures;
黑龙江省社区卫生服务风险因素界定及控制措施探讨
2.
Risk factors analysis of conversion to open procedure in 429 patients undergoing laparoscopic colorectal surgery;
429例腹腔镜结、直肠切除术中转开腹风险因素分析
3.
Risk factors for upper gastrointestinal bleeding in severe craniocerebral injury;
重型颅脑损伤后上消化道出血的风险因素分析
3) Risk factors
风险因素
1.
Research on risk factors of ankle injury in basketball game;
篮球运动踝关节损伤风险因素研究
2.
Operative risk factors assessment for old orthopaedic patients:a review of 760 cases;
760例骨科老年患者手术风险因素分析
3.
Analysis for risk factors of IT outsourcing based on life cycle methodology;
基于生命周期的信息技术外包风险因素分析
4) factor risk
因素风险
5) progress risk
进度风险
1.
A model for progress risk analysis based on multiple risk probability was constructed according to the risk distribution characteristics of naval gun system development.
针对舰炮武器系统研制工程进度的风险分布特征,建立了基于多元风险概率的进度风险分析模型,给出了基于正态分布和指数分布的进度风险估算方法,并结合具体风险因素分析了舰炮武器系统研制进度风险评估的指标和准则,最后给出某型大口径舰炮研制的风险分析实例,验证了文中方法的有效性和可靠性。
2.
The progress risk research in identifying and estimating of major model projects is described first, then a method of progress risk analysis based on Monte Carlo simulation is provided and a case study is presented in detail to illustrate the total process of the method.
对重大型号工程进度风险的识别和估计方法进行了讨论,研究了总工期风险的蒙特卡罗仿真方法,并结合实例对某型号项目研制进度风险进行了定量分析。
3.
tactical and technical targets,progress and cost) in the aerospace projects,this paper puts forwards a random network model of aerospace project development process by using the theory and method of random network,analyses the expensie risk and the progress risk of the project.
鉴于各种不确定性因素对航天三项关键参量(战术技术指标,进度和费用)影响的重要性,应用随机网络理论和方法,建立了航天项目研制过程的随机网络模型,对航天项目进度风险和费用风险进行了定量化分析和研究。
6) schedule risk
进度风险
1.
Study of Chemical Product Manufacturing Relocation Project Schedule Risks;
产地转移化工项目进度风险研究
2.
This paper established is a risk analysis models of normal distribution, β distribution and triangular distribution of Graphical Evaluation and Review technique, for the study of the character of developmental program of weapon equipment schedule risk distribution.
为研究装备研制工程进度的风险分布特征,建立了包含正态分布、β分布、三角分布的随机网络 进度风险分析模型,通过蒙特卡罗法仿真获得工程项目的进度估计及其统计分布特性,从而获得工程总工期的 风险,并结合实例进行了分析。
3.
Then,the definition of construction schedule risk is given and the MC simulation method for the schedule risk is proposed.
分析水利水电工程施工进度计划对工程建设动态投资的影响 ,给出施工进度计划风险的定义 ,提出施工进度风险计算的MC仿真方法 。
补充资料:风险因素
风险因素
[风险因素1风险因素是指能够引起或增力l风险事件发生的机会或影响损失程度的因素‘它是事故发生的潜在条件,一般又称风险穿件。它主要包括:第一,实质风险因素。即推增加某一标的的风险发生机会或损失程度的嗜接条件,属于有形因素。如环境污染就是影晰人们健康的实质性因素。第二,道德风险区素。即指由于个人不诚实或不良企图,故意伍使风险事件发生或扩大已发生的风险事件的拓失程度的因素。它属于无形因素,一般与人配品德修养有关。如两人联合作案,以其中一六诈死为由向保险公司索取保险赔款。第三,J已理风险因素。即指由于人们主观上的疏忽与刘失,或不够谨慎小心等行为而导致增加风险李件发生的机会或扩大了已发生的风险事件的折失程度的因素。它也属于无形因素。例如,夕}出忘记关掉电炉的开关,以致增加发生火灾配可能。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。