1) BeiyinQushou project
北引渠首
1.
Therefore, after detailed studies of the above influence factors,the paper establishes the index eval uation system,and applies many models to the sluice optimum scheme of BeiyinQushou project.
泄洪闸是引嫩骨干工程北引渠首最为关键的建筑物,其规模大小将直接决定整个工程的投资、淹没占地及未来防洪成本,更会对嫩江河势产生深远影响,因此本文在详细研究了上述影响因素后,建立了指标评价体系,并应用多个模型对北引渠首泄洪闸各方案进行了优选。
2) north conveyance canal head engineering
北引渠首工程
3) canal head of water diversion
引水渠首
4) North Conveyance Canal
北引渠道
5) head sluice
渠首引水闸
1.
he head sluice is a control project for connecting the Eastern Route of the South to North Water Transfer with the main route of Jiaodong water transfer project.
济平干渠渠首引水闸是沟通南水北调东线之南北输水干线和胶东输水干线的控制性工程。
6) canal head
渠首
1.
Several problems on Aotou gate dam canal head alteration design;
敖头闸坝渠首改造设计中的几个问题
2.
This paper presents the enviromental features of forming debris flow,analyses the distribution regularities of time and space for sedimdent motiom in Tuanjie water engineering region,and discrsses the causes of sediment disasters ofcanal headork in debris region.
本文以云南东川团结渠首为研究对象 ,对泥石流多发区引水工程泥沙灾害形成条件进行分析 ,通过渠首型试验研究 ,并结合野外实地踏勘资料综合分析 ,提出了渠首泥沙灾害防治的工程方案和技术措施 ,为工程设计提供可靠的基本参数和依
补充资料:引首
引首 为国画手卷的第一部分。作用类似书籍封面内的副页,长度约为画幅的十分之二。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条