说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 髓芯减压植骨术
1)  bone grafting pith decompression
髓芯减压植骨术
2)  spinal decompression
骨髓芯减压
1.
60 cases(treatment group)were treated with“Gufuhuo Decoction”,an herbal formula,for 3 months,and another 46 cases(control group)were treated by spinal decompression and intravenous drip of Danshen injection for 1 month.
设 6 0例治疗组 ,采用中药自拟骨复活汤内服 ,治疗 3个月 ,4 6例对照组应用骨髓芯减压配合静脉滴注复方丹参液治疗 1个月 ,3个月后观察疗效。
3)  core decompression
髓芯减压术
1.
Biomechanical study of femoral neck after large aperture core decompression
经转子大孔径髓芯减压术对人股骨颈力学强度的影响
4)  Core decompression
髓芯减压
1.
Curative effects of core decompression and allografting of bone marrow stromal cells on avascular necrosis of the femoral head in rabbits;
髓芯减压和骨髓基质细胞移植对家兔股骨头缺血性坏死的治疗作用
2.
Clinical evaluation of core decompression of femoral head assisted with arthroscopy debridement for avascular necrosis of femoral head;
多孔髓芯减压并关节清理治疗早期股骨头缺血性坏死
3.
Core decompression combined with implantation of self-multipotent stem cell and decalcified bone matrix for treatment of early femoral head necrosis;
髓芯减压加自体多能干细胞、脱钙骨基质植入治疗早期股骨头坏死
5)  marrow core decompression with thick passage
粗通道髓芯减压术
6)  decompression of spinal cord
脊髓减压术
补充资料:Z8612热芯盒射芯机操作规程
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、
检查设备上行程开关和碰块的位置是否正确,如不正确,必须调整。
b、
接通电源,打开压缩空气伐门,先用手动方法,对各机构逐进行点动试车,然后用自动方法,进行一个循环试车,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、
在设备开动后,一个循环未完成时,不许中途调整电器,以免发生误动作,造成设备人身事故;
b、
设备的每一个循环后,必须用喷咀清除芯盒上残存的砂子,并喷涂分型剂;
c、
在未切断电源和所气源前,不准将手伸入芯盒和夹紧器之间的空隙处,或把手放在导轨上,以免发生人身事故。
d、 一般不准空射,如必须空射,一定要把压缩空气伐门关小;
e、 如果用手操作,不准同时操作两个电器开关。
4、工作后还必须遵守:
a、
操纵各个电器开关,使设备各机构恢复到原始位置,然后切断电源和气源;
b、 折下射砂头,清理积砂和粘砂;
c、 清除排气塞内的粘砂;
d、
取下射砂筒,清除缝隙中的粘砂,最后用石蜡涂擦内壁,但不要将缝隙堵塞;
e、 清除闸板上的积砂,并在闸板上涂石墨粉,以减少磨擦;
f、 清除导轨和导杆上的积灰和积砂,并涂上一层润滑油。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条