1)  flow rhythm
流程节奏
1.
While with the continuous casting process as the center of EAF steelmaking flow,it is more significant through strengthen the LF\'s refining process,so that reduce refining time to increase the LF\'s adjusting ability to regulate the flow rhythm in order to achieve sequence casting.
对于以连铸为中心的电炉流程,通过强化LF炉精炼过程、减少精炼时间,以提高其对电炉流程节奏的调节能力,实现多炉连浇意义重大。
2)  full rhythm
全程节奏
1.
His full rhythm is not so rational,And he lacks the experience of competing in world major competitions.
通过对杨耀祖的全面研究和分析,发现杨耀祖存在绝对速度较差,全程节奏不够合理,国际比赛和大赛经验较为缺乏等问题和不足。
3)  flow construction of some related operations with different tact
非节奏流水
1.
The method that defines bounds of allowable deviation of construction works in site by the vertical schedule graph of flow construction of some related operations with different tact has been interpreted.
阐释了利用非节奏流水垂直进度计划表确定施工过程允许偏差范围的方法 ,并相应给出了确定的原则 :某施工过程在某施工段上提前或延迟 ,不会增加该施工过程在其他施工段上的流水强度 ;不会造成紧前施工过程与紧后施工过程在逻辑关系上的矛盾 ;不会造成总工期的延误。
4)  rhythm characteristics between hurdles
全程栏间节奏
1.
Through observed the kinescopes of the 15th Asian Games and Athens Olympic Games that Huang Xiao-xiao participated in 400m hurdle race, we collected her technique data and her rhythm characteristics between hurdles, and compared them with the excellent athletes in the world, in order that we can find the differences from them for Huang s training to prepare for "2 Games".
运用生物力学手段分析黄潇潇参加第15届亚运会女子400m栏决赛的录像,得出其技术指标,并搜集黄潇潇参加雅典奥运会女子400m栏等国际比赛的数据,整理黄潇潇全程栏间节奏的特点,并与世界优秀选手进行比较,从中找出差距,为其备战"两运会"的训练提供帮助。
5)  Arhythmic Pipelining Building
非节奏流水施工
1.
Methods of Arhythmic Pipelining Building Schedule Cartography;
非节奏流水施工进度计划的直接绘图法
6)  unregular flowing water construction
无节奏流水施工
1.
At last,through engineering actual examples,elaborates priority election of unregular flowing water construction order,so as to give a reasonable arrangement for it,and furtherly enhances the production efficiency of labor and engineering quality.
对无节奏流水施工进行了介绍,探讨了组织无节奏流水施工的要点,分析了无节奏流水施工的主要参数,提出了确定工期的方法,通过工程实例,对无节奏流水施工顺序优选进行了说明,以合理安排无节奏流水施工顺序,从而提高劳动生产率和工程质量。
补充资料:流程
①水流的路程:水流湍急,个把小时,就能越过百里~◇生命的~。②工业品生产中,从原料到制成成品各项工序安排的程序。也叫工艺流程。