1)  time-cost tradeoff problem
时间-费用权衡问题
1.
The research on time-cost tradeoff problem started from the early 1960s and the relative scope has expanded a lot in the following decades.
时间-费用权衡问题的研究始于上世纪六十年代初,并且所涉及的范围在随后的几十年中大为扩展,但在问题的解决上却一直未取得突破性进展,最主要的瓶颈就是解决该类问题时所遇到的高复杂度和大计算量。
2)  time-cost trade off
时间-费用问题
3)  time/cost trade-offs
时间-费用权衡
1.
In the project management,the project s duration can often be compressed by accelerating some of its activities at an additional expense,this is the so-called time/cost trade-offs problem(for short,TCTP),which has been studied extensively in the project scheduling literatures.
项目管理中,通过增加额外费用来加速执行项目的某些活动,以此达到缩短项目工期的目的,这就是在项目调度文献中被广泛研究的时间-费用权衡问题
4)  time-cost trade-off
时间费用权衡
5)  discrete time-cost trade-offs
离散时间-费用权衡
1.
The discrete time-cost trade-offs problem(DTCTP) with bi_criteria optimization model is a most widely concerned in project scheduling literatures,which has been studied under three possible forms: 1)P1: the deadline problem.
离散时间-费用权衡问题(DTCTP)是项目进度文献中被研究最多的双目标优化问题,它通常以三种形式出现:1)P1:截止日期问题;2)P2:预算问题;3)P3:工期-费用曲线问题。
2.
The discrete time-cost trade-offs problem(DTCTP,for short) is a most widely concerned with bi-criteria optimization model in project scheduling literatures,which has been studied under three possible objectives.
离散时间-费用权衡问题(DTCTP)是项目进度中研究最多的双目标优化问题,它通常以三种形式出现:(1)P1:截止日期问题,在项目截止日期约束下使完成项目的总费用最小;(2)P2:预算问题,在费用预算约束下使项目工期最短;(3)P3:工期-费用曲线问题,找出全部有效的工期-费用模式集合。
6)  time,problem
问题时间