说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 我看变动成本法
1)  Talking about Variable Cost Method
我看变动成本法
2)  variable costing method
变动成本法
1.
Compares the absorption costing method and the variable costing method by three examples.
通过3个例子来比较制造成本法和变动成本法下的利润,得出结论:在业绩评价中应根据企业的实际情况谨慎选择成本计算方法。
3)  variable cost approach
变动成本法
1.
In order to reconstruct and improve the traditional system, a Du Pont system based on variable cost approach is built by integrating the latter into the traditional Du Pont system.
为了对传统的杜邦财务系统进行扩展和改进,将变动成本法与传统的杜邦系统相结合,建立了基于变动成本法的杜邦系统,并运用连锁替代法,建立了杜邦财务系统的连锁替代分析模型。
4)  variable costing
变动成本法
1.
The Differences between Variable Costing and Absorption Costing;
变动成本法与全额成本法的区别初探
2.
To solve the problem, variable costing and the 3 theoretical approaches to its application are discussed in this article, and illustrated by examples the practical usage of variable costing is explored.
通过阐述变动成本法的涵义及在我国理论界推行变动成本法的三种形式,并进行例证分析,初探变动成本法在实际中的应用。
3.
This article compares and analyzes full costing and variable costing from introducing variable costing.
从介绍变动成本法入手,利用全部成本法和变动成本法的对比分析,剖析两种方法下利润表的不同及原因,进而证明采用变动成本法对利润表进行分析的重要性。
5)  variable cost method
变动成本法
1.
Complete cost method and variable cost method are two different cost calculation methods with distinct characteristics.
完全成本法与变动成本法是两种不同的成本计算方法,有着各自不同的特点。
2.
The calculation of profit-and-loss critical points of an enterprise is generally based on variable cost method,but also based on manufacturing cost method.
企业对盈亏临界点的计算通常是以变动成本法为基础,但也有以制造成本法为计算基础的,对于这两种成本方法计算的几种盈亏临界点的情况,本文结合案例,通过比较分析认为:盈亏临界点的计算应当以变动成本法为基础更为合理。
6)  variable costing
变动成本计算法
补充资料:短期总变动成本曲线
短期总变动成本曲线:总变动成本曲线取决于总产量曲线。总产量曲线因边际收益递减规律的作用,其形状为先递增(即产量的增加速度随可变投入要素投入量的增加而递增)、后递减(即产量的增加速度随可变投入要素投入量的增加而递减)。所以总变动成本曲线的形状必然是先递减(即总变动成本的增加速度随可变投入要素投入量的增加而递增)、后递减(即产量的增加速度随可变投入要素投入量的增加而递减)。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条