1) Chemical analysis of heap leaching of gold ores
金矿堆浸化学分析
3) heap leach
矿石堆浸
1.
Mantoverde is a heap leach-SX-EW plant that was commissioned in December 1995 at a production rate of 42,130 tons of copper per year and 5.
本文详述了矿石堆浸工艺较之原工厂设计所做的主要改进以及主要的废石堆浸操作参数。
4) Heap Leaching Tailings
堆浸尾矿
1.
Comprehensive Utilization of Heap Leaching Tailings from a Refractory Gold Ore;
某难浸金矿堆浸尾矿的利用
5) leaching heap
待浸矿堆
1.
Fractal feature of ore size distribution in leaching heap blasted directly from stope;
原地爆破浸出工艺待浸矿堆块度的分形特征研究
补充资料:金矿
1.亦作"金矿"。 2.含金的矿石﹔采金的矿山。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条