2) a rotor's check ring
转子挡圈
3) rotor winding
转子线圈
1.
The technical difficulties of turbo-generator stator and rotor windings localized production are being analyzed.
分析了汽轮发电机定子、转子线圈国产化技术难点。
2.
The results show that the system is suitable for monitoring rotor winding temperature of huge hydrogenerator on line and makes monitoring rotor winding temperature be general item and can improve operating reliability of huge hydrogenerator unit.
在三峡水轮发电机组上的应用表明,此系统适用于巨型水轮发电机转子线圈温度的在线监测,可以使转子线圈温度监测成为常规监测项目,提高巨型水轮发电机组运行的可靠性。
4) rotor coils
转子线圈
1.
The manufacturing technique of rotor coils of 100MW air-cooled turbogenerator i s mainly discussed in this paper.
本文重点介绍了空冷100MW汽轮发电机转子线圈的制造工艺和相关的工艺装备,该转子线圈的研制成功,为哈电公司今后生产更大容量的空冷机组奠定了坚实的基础。
5) rotor coil
转子线圈
1.
ome reasons of rotor coils breakdown for WJL-2442-8 type brushless exciterare analyzed, and the process for their repairing is raised in this paper
分析了WJL—2442—8型无刷励磁机转子线圈破压的原因,并提出了修理的工艺方法。
6) rotor half-coil
转子半线圈
补充资料:国际地圈-生物圈计划
国际地圈-生物圈计划 International Geosphere-Biosphere Programme 国际科学联盟理事会(ICSU)发起和组织的一项重大国际科学计划。又称全球变化研究计划。英文缩写IGBP。为解决全球环境问题,1984年国际地学界提出了开展广泛合作,进行地圈-生物圈相互作用的研究,以揭开科学奥秘,保护人类赖以生存的地球环境。1988年ICSU正式提出计划大纲,并组成了IGBP科学委员会。这项计划的科学目标是描述和理解控制全球系统的、相互作用的物理、化学和生物学过程;描述和理解发生在该系统中支持生命的独特环境的变化,以及人类活动对上述基本过程及其变化的影响。研究重点集中在充分反映3个基本过程和圈层间相互作用的界面上,预测数十年至数百年对生物圈影响最大、对人类活动最敏感的重大全球变化问题。已形成近10个科学研究核心项目,初步形成一个完整的、多学科、跨学科的计划。参加这一计划的有40多个国家。中国于1983年起参与酝酿和讨论,1988年成立了国家委员会。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条