说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 世界水评估方案
1)  World Water Assessment Programme
世界水评估方案
2)  scheme of teaching level assessment
水平评估方案
3)  assessment program
评估方案
1.
Customer Satisfaction Assessment Program Research of the China Telecom Branches in AnKang;
中国电信安康分公司客户满意度评估方案研究
2.
New version of assessment program of talents cultivation in higher vocational colleges was issued by Ministry of Education on April 9th,2008,which improved the way of assessment,reduced colleges′ burden and stress for the preparation for this,and showed the direction of higher vocational education′s development.
教育部2008年4月9日颁布了高等职业院校人才培养工作新评估方案,改变了评估实施方式,减轻了院校迎评负担和压力,指明了高等职业教育的发展方向。
4)  evaluation scheme
评估方案
5)  Project evaluation
方案评估
6)  scheme evaluation
方案评估
1.
Aircraft survivability design scheme evaluation based on grey correlation projection;
基于灰色关联投影法的飞机生存力设计方案评估
2.
It also discusses the functions and technical specifications of high-end DSM software,including user DSM scheme evaluation,peak load shifting/averting scheme evaluation and generation,orderly power consumption scheme evaluation and generation,sales revenue evaluation and prediction,medium-term grid planning and optimization,and informati.
其中包括用户DSM方案评估、错峰避峰方案评估与辅助生成、营销收入评估与预测、电网中期规划与优化、信息发布等功能。
3.
It is important to establish military aircraft scheme evaluation index set.
作战飞机方案评估在作战飞机设计及其作战运用中发挥着极其重要的作用,目前已经取得了一些成果,但大都是对飞机的某一个作战过程或某一系统进行评估,难以形成体系研究,系统性较差。
补充资料:地价评估趋势评估法


地价评估趋势评估法


【地价评估趋势评估法】土地价格在一定的时间内由于受诸多因素影响,呈周期性的波动,但总趋势是上升的,因此,利用一定的数学模型,就可以求算出地价,一般要通过回归分析,找出土地价格与时间变量之间的函数关系,画出地价发展变化趋势图形,然后建立数学模型,进而推算出地价。若以Y代表历年地价,X代表时间,丫代表地价,其关系式为:y‘=a+bx(a、b为常数)。采用这一方法,需以长年积累起来的地价变动资料作为分析依据。地价的时间序列最好在ro年以上。因为时间序列愈长,愈能排除偶然因素和短期因素对趋势值的异常干扰。另外,用地价长期趋势图可比较两个地段地价_L涨的强弱程度,如果长期趋线越陡,则表明该地段地价升值性越强;反之,则表明该地价的升值性越弱。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条