1) elimination in time series
时间序列消去法
2) time series method
时间序列法
1.
Time series method is adopted for building the strong wind monitoring and warning system of Qinghai-Tibet Railway to realize the short-term forecast of the wind speed along the line.
青藏铁路大风监测预警系统采用时间序列法实现沿线风速的短时预测。
2.
Summarizing the types and constitution of supply chain costs,the paper uses dynamic programming to solve the cost value in different supply chain links and stages under a fixed cost standard,uses the time series method to forecast and renew the future activity costs and meanwhile uses programming to calculate the optimal costs and dynamic cost trend.
总结了供应链成本的类型与构成,利用动态规划法求解在一定成本标准下供应链不同环节和不同阶段的成本值,利用时间序列法对未来的作业成本进行更新预测。
3.
The reliability is combined with the time series which is corresponding with the reliability,then it is analyzed by time series method;the reliability prediction result can be achieved by the extrapolation of the neural network.
将可靠度与对应的时间序列相结合,采用时间序列法对其进行统计分析,然后应用神经网络向外推测,从而得出电火花线切割机床可靠度的预计结果。
3) time series analysis method
时间序列分析法
1.
Application of time series analysis method in groundwater level dynamic forecast of Shenyang City;
时间序列分析法在沈阳市地下水位动态预报中的应用
2.
By means of time series analysis method,random drift signal output by oriention gyro in navigation system is analyzed under normal and fault conditions so as to obtain a fault identification method of gyro performance.
运用时间序列分析法对正常和故障情况下导航系统中方位保持部件陀螺仪输出随机漂移信号进行分析,得到一种判断陀螺仪性能故障的方法。
4) time series analysis
时间序列分析法
1.
Applying the method of time series analysis to forecasting the paddy water requirement;
时间序列分析法在水稻需水量预测中的应用
2.
This paper employs the neural network method, time series analysis method and recursive neural networks technology based on data mining and knowledge discovery to predict the iron and steel output.
文章使用基于数据挖掘和知识发现的人工神经网络法、时间序列分析法、递归神经网络技术来预测钢铁产量的方法,并将递归神经网络方法预测的结果与前面的两种方法的预测结果进行比较,比较的结果说明该方法是可行的。
5) Modeling With Time Series
时间序列法建模
6) time series method
时间序列方法
1.
The time series method is used to extract the regular part from the residual series received by modeling of observed data.
利用时间序列方法,分析去除确定性部分后的残差序列,提取其中的有规律成分作为预报时的补偿项,形成叠合模型,进行建筑物观测资料的分析。
2.
The monthly central tax revenues forecasting is considered based on time series method.
研究了基于时间序列方法的国税月度收入预测。
补充资料:时间
实际上,时间单位首先从天文观测来确定的,“1平太阳日或1天(1昼夜)”是以地球相对于太阳的自转周期为基准来计量的,一个平太阳日的1/86400为1秒;后来发现地球自转不均匀,1960年国际度量衡大会把时间基准改为以地球绕太阳公转周期,即规定为1900年地球公转周期(回归年)的1/31556925.9747为1秒;随着精确、稳定的原子钟制成,1967年国际度量衡大会规定国际单位制原子时的时间单位“秒(长)是两个超精细能级之间跃进所对应辐射9192631770个周期的持续时间”。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条